PPR for the installation of reinforced concrete structures of the tank for emergency draining of turbine oil.
- Added: 01.03.2023
- Size: 30 MB
- Downloads: 0
Description
PPR on reinforced concrete structures of the tank for emergency draining of turbine oil at the CHPP.
Content:
1 AREA OF USE
1.1. Conditions for the production of works. Brief description of the object
1.2. Contractor Responsibilities
1.3. Customer Responsibilities
2 TECHNOLOGY OF PRODUCTION OF WORKS
2.1. The engineering geodesy
2.2. The device of a pit under a tank
2.2. Concrete preparation for the tank
2.3. Structural reinforcement
2.4. Formwork
2.5. Concrete works
2.6. Tank waterproofing
2.7. backfilling
3 NEED FOR MACHINES AND MECHANISMS, TECHNOLOGICAL TOOLS AND PERSONNEL
4 REQUIREMENTS FOR QUALITY AND ACCEPTANCE OF WORKS
5 OCCUPATIONAL SAFETY DURING WORK PRODUCTION
5.1. General provisions
5.2. OHS measures when working with power tools
5.3. Fire safety
Project's Content
|
_v03_ППР. Устройство ж-б конструкций под бак аварийного слива турбинного масла.pdf
|
1. Бетонирование конструкций.dwg
|
2.Котлован.dwg
|
3.Монтаж СК.dwg
|
Строповка.dwg
|
_ППР. Устройство ж-б конструкций под бак аварийного слива турбинного масла.docx
|