PPR on reinforced concrete structures of the tank for emergency draining of turbine oil at the CHPP.

 

Content:

 

1 AREA OF USE

 

1.1. Conditions for the production of works. Brief description of the object

 

1.2. Contractor Responsibilities

 

1.3. Customer Responsibilities

 

2 TECHNOLOGY OF PRODUCTION OF WORKS

 

2.1. The engineering geodesy

 

2.2. The device of a pit under a tank

 

2.2. Concrete preparation for the tank

 

2.3. Structural reinforcement

 

2.4. Formwork

 

2.5. Concrete works

 

2.6. Tank waterproofing

 

2.7. backfilling

 

3 NEED FOR MACHINES AND MECHANISMS, TECHNOLOGICAL TOOLS AND PERSONNEL

 

4 REQUIREMENTS FOR QUALITY AND ACCEPTANCE OF WORKS

 

5 OCCUPATIONAL SAFETY DURING WORK PRODUCTION

 

5.1. General provisions

 

5.2. OHS measures when working with power tools

 

5.3. Fire safety

Project's Content

icon
icon _v03_ППР. Устройство ж-б конструкций под бак аварийного слива турбинного масла.pdf
icon 1. Бетонирование конструкций.dwg
icon 2.Котлован.dwg
icon 3.Монтаж СК.dwg
icon Строповка.dwg
icon _ППР. Устройство ж-б конструкций под бак аварийного слива турбинного масла.docx
up Up