PPR for the installation of reinforced concrete structures of the tank for emergency draining of turbine oil.

Description

PPR on reinforced concrete structures of the tank for emergency draining of turbine oil at the CHPP.

 

Content:

 

1 AREA OF USE

 

1.1. Conditions for the production of works. Brief description of the object

 

1.2. Contractor Responsibilities

 

1.3. Customer Responsibilities

 

2 TECHNOLOGY OF PRODUCTION OF WORKS

 

2.1. The engineering geodesy

 

2.2. The device of a pit under a tank

 

2.2. Concrete preparation for the tank

 

2.3. Structural reinforcement

 

2.4. Formwork

 

2.5. Concrete works

 

2.6. Tank waterproofing

 

2.7. backfilling

 

3 NEED FOR MACHINES AND MECHANISMS, TECHNOLOGICAL TOOLS AND PERSONNEL

 

4 REQUIREMENTS FOR QUALITY AND ACCEPTANCE OF WORKS

 

5 OCCUPATIONAL SAFETY DURING WORK PRODUCTION

 

5.1. General provisions

 

5.2. OHS measures when working with power tools

 

5.3. Fire safety

Project's Content

icon
icon _v03_ППР. Устройство ж-б конструкций под бак аварийного слива турбинного масла.pdf
icon 1. Бетонирование конструкций.dwg
icon 2.Котлован.dwg
icon 3.Монтаж СК.dwg
icon Строповка.dwg
icon _ППР. Устройство ж-б конструкций под бак аварийного слива турбинного масла.docx
The material is an archive with files that can be opened in programs:
  • Adobe Acrobat Reader
  • AutoCAD or DWG TrueView
  • Microsoft Word
up Up