• RU
  • icon Waiting For Moderation: 0
Menu

PPM for tunnel reinforcement

  • Added: 14.08.2014
  • Size: 2 MB
  • Downloads: 2
Find out how to download this material

Description

The present PWP for reinforcement provides for the performance of works on reinforcement of permanent lining of SFMS (by 4 m approach). Reinforcing is conducted by the flat reinforcing frameworks consisting of 5 sections (KP7, KP2, KP3, KP4, KP5), the step of frameworks along a tunnel is equal to 200 mm.

Project's Content

icon
icon
icon ППР на армирование.dwg

Additional information

Drawings content

icon ППР на армирование.dwg

ППР на армирование.dwg
up Up