• RU
  • icon Waiting For Moderation: 2
Menu

PPM for tunnel reinforcement

  • Added: 14.08.2014
  • Size: 2 MB
  • Downloads: 2
Find out how to download this material

Description

The present PWP for reinforcement provides for the performance of works on reinforcement of permanent lining of SFMS (by 4 m approach). Reinforcing is conducted by the flat reinforcing frameworks consisting of 5 sections (KP7, KP2, KP3, KP4, KP5), the step of frameworks along a tunnel is equal to 200 mm.

Project's Content

icon
icon
icon ППР на армирование.dwg

Additional information

Drawings content

icon ППР на армирование.dwg

ППР на армирование.dwg

Free downloading for today

Update after: 11 hours 53 minutes
up Up