PPM for tunnel reinforcement

  • Added: 14.08.2014
  • Size: 2 MB
  • Downloads: 2
Find out how to download this material

Description

The present PWP for reinforcement provides for the performance of works on reinforcement of permanent lining of SFMS (by 4 m approach). Reinforcing is conducted by the flat reinforcing frameworks consisting of 5 sections (KP7, KP2, KP3, KP4, KP5), the step of frameworks along a tunnel is equal to 200 mm.