PPM for tunnel reinforcement
- Added: 14.08.2014
- Size: 2 MB
- Downloads: 2
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The present PWP for reinforcement provides for the performance of works on reinforcement of permanent lining of SFMS (by 4 m approach). Reinforcing is conducted by the flat reinforcing frameworks consisting of 5 sections (KP7, KP2, KP3, KP4, KP5), the step of frameworks along a tunnel is equal to 200 mm.
Project's Content
|
|
ППР на армирование.dwg
|
Additional information
Drawings content
ППР на армирование.dwg
Similar materials
- 18.06.2021
- 20.12.2023
- 09.07.2014
Free downloading for today
Update after: 1 hour 16 minutes