• RU
  • icon Waiting For Moderation: 8
Menu

Monolithic residential building project

  • Added: 13.07.2012
  • Size: 7 MB
  • Downloads: 2
Find out how to download this material

Description

Set of drawings and documentation for coursework.

Project's Content

icon
icon
icon
icon 1. Архитектура.doc
icon 2. Конструкции.doc
icon 3.ТСП.doc
icon 4.Управление в строительстве.doc
icon 5. Экономика в строительстве.doc
icon 6. БЖД.doc
icon Анотация.doc
icon задание.doc
icon записка.doc
icon календ[1]. раб. план.doc
icon план студента.doc
icon Содержание.doc
icon табл.4.2.2.doc
icon SmLocF4NewMat1.xls
icon
icon
icon ФАСАДЫ Цвет.dwg
icon Цвет боков.jpg
icon Цвет ФАСАД 3-1.jpg
icon ЦВЕТ-ФАСАД 1-3.jpg
icon 10 - календарный.dwg
icon 11 - стройгенплан.dwg
icon 2 лист.dwg
icon 3 лист.dwg
icon 4 лист.dwg
icon 5 плита перекрытия.dwg
icon 6 ростверк.dwg
icon 7 - земляные работы.dwg
icon 8 - 06,02,07Технология забивка свай.dwg
icon 9 - ТСП фундаменты ростверк.dwg

Additional information

Contents

Introduction

1. Architectural and planning solutions

1.1. General Data

1.2. Space Planning Solution

1.3. Architectural and structural solution

1.3.1. Bases

1.3.2. Exterior walls

1.3.3. Floors and coverings

1.3.4. Partitions

1.3.5. Windows and balconies

1.3.6. Doors

1.3.7. Floors

1.3.8. Finishing

1.3.9. Heating

1.3.10. Water supply

1.3.11. Sewerage

1.3.12. Rain sewer

1.3.13. Power supply

1.3.14. Gas supply

1.3.15. Outdoor lighting

1.3.16. Drainage

1.3.17. Environmental protection

1.3.18. Fire fighting measures

1.3.19. Radio

1.3.20. Television

1.3.21. Installation of telephones

1.3.22. Refuse chute

1.4. Heat Engineering Calculation of Enclosing Structures

1.4.1. Heat Engineering Calculation of Wall Fencing

1.4.2. Thermal calculation of the coating

1.5. Technical and economic indicators

1.6. Master Plan

2. Design Solutions

2.1. Source Data

2.2. Calculation of monolithic slab with intermittent support

2.2.1. Load collection

2.2.2. Plate strength calculation

2.2.3. Calculation of plate crack resistance

2.2.4. Determination of crack opening width

2.2.5. Plate Deflection Definition

2.3. Foundation calculation

2.3.1. Construction conditions

2.3.2. Pile Foundation Calculation

2.3.3. Calculation of reinforced concrete pile reinforcement

3. Construction production technology

3.1. Routing for earthworks

3.1.1. Scope of works included in the Job Instruction

3.1.2. Description of working conditions

3.1.3. Requirements for readiness of previous works

3.1.4. Methods and sequence of work execution

3.1.5. Calculation of needle filters

3.1.6. Pit Calculation

3.1.7. Winterization

3.1.8. Calculation of labor costs

3.1.9. Technical and economic indicators

3.1.10. Quality Control

3.1.11. Safety precautions

3.2. Job Instruction for Pile Diving by Impact Method

3.2.1. Characteristics of the building and its structural elements

3.2.2. Scope of works included in the Job Instruction

3.2.3. Description of working conditions

3.2.4. Requirements for readiness of previous works

3.2.5. Methods of delivery and storage of structures and materials

3.2.6. Work Sequence Methods

3.2.7. Peculiarities of piling in winter

3.2.8. Pile cutting

3.2.9. Features of piling in winter

3.2.10. Calculation of Labor Activities

3.2.11. Numerical and qualification composition of links

3.2.12. Need for Construction Structures and Materials

3.2.13. Quality Control

3.2.14. Safety precautions

3.3. Job instruction of monolithic pedestal

3.3.1. Scope of works included in the Job Instruction

3.3.2. Description of working conditions

3.3.3. Organization and technology of the construction process

3.3.4. Ways to deliver and store advice and materials

3.3.5. Methods and sequence of work execution

3.3.6. Winterization

3.3.7. Calculation of labor costs

3.3.8. Quality Control

3.3.9. Safety precautions

3.3.10. Technical and economic indicators

3.3.11. Logistical resources

3.3.12. Need for machinery and tools

4. Management in construction

4.1. Introduction

4.1.1. Geodetic works in construction

4.1.2. Methods of execution of main types of works

4.1.3. Work Execution Order

4.1.4. Preparation of construction production

4.1.5. Earthworks

4.1.6. Concrete and reinforced concrete structures

4.1.7. Insulation and finishing works

4.1.8. Loading and unloading works

4.1.9. Winterization

4.1.10. Safety and Fire Safety Measures

4.1.11. Environmental protection measures for the period of construction

4.2. Construction Schedule

4.2.1. Technical and economic indicators of the schedule

4.3. Construction Master Plan

4.3.1. Construction Plot Plan Description

4.3.2. Calculation of required crane parameters

4.3.3. Defining the Need for Temporary Buildings

4.3.4. Calculation of temporary power supply

4.3.5. Calculation of temporary water supply

4.3.6. Calculation of storage sites

4.3.7. Construction Plot Plan Description

4.3.8. Technical and economic indicators

5. Economy in construction

5.1. General provisions

5.2. Composition and types of estimate documentation

5.2.1. Local estimates

5.2.2. Object estimates

5.2.3. Summary Estimate

5.3. Calculation of estimated cost

6. Safety of life

6.1. General provisions

6.2. Safety measures for concrete and reinforced concrete works

6.3. Organization of workplaces

6.4. Procedure of works execution

6.5. Installation works

Conclusion

Literature

Appendix A

Appendix B

Contents

Summary

The explanatory note deals with 6 sections.

The architectural and planning section (section 1) presents:

space-planning solutions;

heat engineering calculation of enclosing structures was performed;

technical and economic indicators for the facility were calculated.

The designed office building is located in the existing administrative zone of the city.

The technical solutions adopted in the working drawings comply with the requirements of environmental, sanitary hygenic, explosion-fire and other standards applicable in the territory of the Russian Federation, and ensure safe operation of the facility for life and health of people.

In the structural section (section 2) the monolithic slab of the floor, piles and monolithic pile is considered and calculated. Loads were collected in accordance with the current design provisions. The results of the calculation were used in the design of the main structural elements.

Section 3 "Construction Process" presents the following tables: Bill of Quantities, Labour and Machine Time Schedules and describes the methods of work execution. The main types of works with a brief justification of the applied methods and means of complex mechanization are presented. The project provides for progressive technology based on modern machines, mechanisms and equipment. There are also: safety and health, environmental and fire safety; requirements for quality and acceptance of works; list of process equipment, tools, equipment and accessories.

In total, the diploma project has developed three process plans:

1. Earthworks - pit development. 2. Piling works. 3. Monolithic works on pile pile concreting.

In section 4, a construction plan and the organization of construction production were developed. During the development of the construction plan, the following calculations were carried out:

- determination of areas of temporary buildings: sanitary facilities, office premises,

calculation of water demand;

calculation of electrical installations .

Another calculation of crane selection was made. Complex process of erection of metal structures consists of procurement and construction processes, which are technologically and organizationally interconnected .

The organization of the construction of the facility shall provide for maximum compatibility of works in time and flow on the basis of complex mechanization of all works.

Section 5 "Construction Economics" presents the estimates that were prepared in the basis index manner at the prices of 2001. using indices for March 2007.

The section "Labor protection" (section 6) presents:

analysis of the main hazards arising during the construction of the facility and safety measures that reduce the possibility of injuries;

Conclusion

The diploma project was developed on the topic "12-story monolithic residential building on the street. Suvorov."

The project considered architectural and planning solutions: general data on the construction site, master plan, space planning solutions, structural solutions, architectural and artistic solution, engineering equipment, fire prevention measures, technical and economic indicators; structural solutions: calculation and design of a monolithic beam-free slab, calculation of a pile, calculation and design of a monolithic pile, calculation and design of a monolithic slab; construction production technology: condition for construction, brief description of the building, brief description of the main methods of work, process map for earthworks; Job instruction for piling operations; process chart for concreting of monolithic pile-top, control in construction: construction schedule, construction master plan; economy in construction: general provisions, composition and types of estimated documentation, calculation of estimated cost; safety of life: analysis of hazardous and harmful factors during construction work, calculation of artificial lighting.

The graphic part of the project presents the perspective of the building, facades, plans of the first; typical floors; basement and technical floor, sections, roofing plan, units, drawings of the main structures of the building, flow charts, work schedule for the construction of the building, construction master plan.

The project was developed in full compliance with the requirements of the current building codes and regulations.

Drawings content

icon 10 - календарный.dwg

10 -  календарный.dwg

icon 7 - земляные работы.dwg

7 - земляные работы.dwg

icon 8 - 06,02,07Технология забивка свай.dwg

8 - 06,02,07Технология забивка свай.dwg

icon 9 - ТСП фундаменты ростверк.dwg

9 - ТСП фундаменты ростверк.dwg

Free downloading for today

Update after: 3 hours 53 minutes
up Up