Modular boiler house project at the field
- Added: 09.07.2014
- Size: 729 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The project provides for the installation of three KSV-3.0 boilers. The boiler room is provided with the main energy carriers, engineering communications: natural gas, electricity, water, a centralized sewerage network
Project's Content
|
ВСЕ_corr.dwg
|
Additional information
Drawings content
ВСЕ_corr.dwg
Similar materials
- 03.07.2014
- 25.10.2022
- 01.07.2014
Free downloading for today
Update after: 53 minutes