MMDC Moscow-City, section N14 - PPR on the device opening in the existing wall ST-2 in axes 30-37
- Added: 09.07.2014
- Size: 1 MB
- Downloads: 3
Find out how to download this material
Subscribe to receive an information about new materials:
Description
PWP for arrangement of openings in 'wall in soil' by method of cutting with diamond ropes
Project's Content
|
ППР резка 2_recover.dwg
|
Additional information
Drawings content
ППР резка 2_recover.dwg
Similar materials
- 09.07.2014
- 05.07.2023
- 28.10.2022
- 09.07.2014
Free downloading for today
Update after: 1 hour 58 minutes
- 20.08.2014