Metal structures - beam cage

  • Added: 23.01.2015
  • Size: 234 KB
  • Downloads: 1
Find out how to download this material

Description

Job to perform coursework.

Site dimensions in plan, m2 3L * 3B

L = 21 m -shag of columns in longitudinal direction;

B = 7 m is the pitch of the columns in the transverse direction;

Construction height - 2.3m;

Site height dimensions:

Clean floor elevation - 0.000;

The elevation of the top of the flooring is 9.5 m.

Rated time load pn = 32 kN/m2.

Materials used:

Flooring beams - C255;

The main beams are C345;

Columns - C 255;

Concrete grade of foundations - B12.