• RU
  • icon Waiting For Moderation: 20
Menu

Internal water supply and sewerage of industrial building "

  • Added: 11.12.2017
  • Size: 262 KB
  • Downloads: 0
Find out how to download this material

Description

1. Input It is required to design the internal water supply and sewerage systems of the industrial building. Construction area: Chelyabinsk region; The height of the workshop: 4.8 m.; The height of the auxiliary rooms: 4.8 m.; Number of employees: 120 people; Workshop with heat generation: below 84 kJ per 1 m3/h; Building fire hazard category: B; Fire resistance rating of the building: III; Guarantee head of the water supply network: 27 m.; Ground elevation at the building: 59.4 m.; Floor elevation of the first floor: 59.1 m.; Sewage discharge length: 8.0 m.

Project's Content

icon
icon PLAN_PO_VIV.dwg

Free downloading for today

Update after: 14 hours 59 minutes
up Up