• RU
  • icon Waiting For Moderation: 0
Menu

Internal power supply project for multi-storey building

  • Added: 17.08.2012
  • Size: 15 MB
  • Downloads: 1
Find out how to download this material

Description

many drawings, description

Project's Content

icon
icon
icon 1-ый этаж29,61.dwg
icon 1-я секция квартиры.исправленныеdwg.dwg
icon 2-я сек. квартиры.исправл.урезанdwg.dwg
icon 2-я секция квартиры.исправленныеdwg.dwg
icon 2Этаж30,62.dwg
icon plot.log
icon ванная25.dwg
icon Вент.камеры33,65.dwg
icon Диспетчерская20.dwg
icon Лист 21 Насосная.dwg
icon Лист 21 Тепловой пунк.dwg
icon Лист16 Электрощитовая№1.dwg
icon Лист17 КабельноеПомещение№1.dwg
icon Лист18 Электрощитовая№2.dwg
icon Лист19 КабельноеПомещение№2.dwg
icon Лист23,24уравнивание потенциалов.dwg
icon Лист26Световое ограждение.dwg
icon Лист27Молниезащита.dwg
icon Лист27Система уравнивания потенциалов.dwg
icon Общие данные на 23 корпус.doc
icon ПовалЛист28,60.dwg
icon Пом.лифтов34,35,66,67.dwg
icon Пояснение к спецификации.doc
icon Спецификация на 1 этаж.doc
icon Спецификация общая.doc
icon
icon Внешнее электроснабжение.cdw
icon ГРЩ-1-23.09.06.cdw
icon ГРЩ-2-23.09.06.cdw
icon Штамп.cdw
icon ЩД(диспетчер)2-я категория.cdw
icon Щит арендаторов№1.cdw
icon Щит арендаторов№2.cdw
icon Щит ОПС.cdw
icon ЩКД(диспетчер).cdw
icon ЩКобщ..cdw
icon ЩЭ-Схема1.1.cdw
icon ЩЭ-Схема1.cdw
icon ЩЭ-Схема2.1.cdw
icon ЩЭ-Схема2.2.cdw
icon ЩЭ-Схема2.cdw
icon типовой этаж31,63.dwg
icon Титульный лист.doc
icon ЧЕРДАК Лист 32,64.dwg

Additional information

Lighting

The design provides for the following types of lighting:

- working

- emergency, evacuation

- outdoor lighting.

Working lighting is provided in all rooms.

Evacuation lighting - in corridors, elevator halls, staircases.

Emergency lighting - GRF, heat station, water metering unit, elevator machine rooms, concierge room, control room.

For outdoor lighting, lamps on brackets with a mercury lamp are installed on the courtyard facades.

General lighting of rooms is performed by fluorescent lamps and filament lamps.

Lighting Control:

- local;

- remote (from control panel).

Earthing, Potential Equalization System

Protective grounding and potential equalization system shall be performed in accordance with PUE requirements.

TNCS grounding system is used in the residential building.

The main grounding bus (GZSH) is installed in each electrical panel next to the GRF.

The main grounding joints of GRSCH No. 1 and GRSCH No. 2 are interconnected .

GZSH is made of copper with a section of 500mm ² (50x10). A ┴ sign must be placed on the wall above the tyre.

The following are connected to GWN:

- metal parts of the building frame (reinforcement);

- metal pipes of utilities included in the building: hot and cold water supply, sewage, heating, etc.;

- metal parts of centralized ventilation systems and

conditioning;

- grounding device of lightning protection system;

- RE DBU tire.

In each apartment in the bathroom, an additional potential equalization system is made by connecting all metal parts (plumbing equipment, pipes, bath) to the PE bus.

Protective grounding and potential equalization system shall be performed in accordance with PUE requirements.

Lightning protection

In accordance with the instruction on lightning protection of buildings, structures and industrial enterprises SO15334.21.1222003, a residential building refers to a regular facility. At the IIV protection level, use a steel grounding conductor of at least 80 mm ², a steel current collector of at least 50 mm ², a steel lightning receptacle of at least 50 mm ²,

A lightning screen made of steel wire d- 8 mm is laid in the layer of the roof insulation. with cell 8x8 m. with units on welding.

Current leads are made with steel wire d- 10 mm, which are connected to the grounding circuit laid along the perimeter of the building at a depth of 0.81.0 m from the ground surface with a steel strip 40x4 mm.

Lightning screen is connected to natural current leads - steel reinforcement of the building.

Metal reinforcement of reinforced concrete structures is considered to provide electrical continuity if it meets the following conditions:

• Approximately 50% of the vertical and horizontal rod connections are welded or rigid (bolted, wire bonded);

• Electrical continuity is ensured between steel reinforcement of various pre-prepared concrete blocks and reinforcement of concrete blocks prepared on site.

It is not necessary to lay horizontal belts if the metal frames of the building or steel reinforcement of reinforced concrete are used as current leads.

Light fence

For the safety of flights of aircraft, light fencing is provided at the highest sections of the roof. Lamps with red caps of type 30L2M are used as lights of light enclosure.

Energy saving

In order to save electricity, the project provides for the management of evacuation and working lighting of staircases, corridors, elevator halls, entrances and entrances to the house from the control room automatically:

- actuation at darkness;

- disconnection of lamps at dawn.

Actuation of working lighting on floors and in elevator halls is performed by device of short-term actuation.

Installation Instructions

Perform operations in accordance with the current SNiP 3.05.0685, PUE. According to the requirement of item 3.18 of SNiP 3.05.0685, passages through the walls must be made in pipe sections, ducts or openings. Lay an independent protective conductor starting from the group electrical panel. Zero protective conductor shall be connected to protective contacts of sockets, lighting equipment and equipment.

When supplying several sockets of the same group line, branches of the protective conductor to each socket must be made at the branch points in the unpacking boxes and in the boxes for installation of sockets in one of the accepted ways (soldering, welding, pressure testing, special compressible, terminals, etc.). Serial inclusion of protective contacts in the protective conductor is not allowed .

Connection to group panel for common contact clamp of zero working and protective conductors is prohibited.

Electrical wiring according to PUE item 2.1.31 shall provide easy recognition along the entire length of conductors by colors:

- blue color - to indicate zero working conductor;

- yellow-green color - to indicate the PE-protective conductor ("ground");

- black, brown, white and other colors - to indicate a phase conductor.

Electrical equipment and materials used for installation shall have a certificate of compliance with the Gosstandart of Russia.

Drawings content

icon 1-ый этаж29,61.dwg

1-ый этаж29,61.dwg

icon 1-я секция квартиры.исправленныеdwg.dwg

1-я секция квартиры.исправленныеdwg.dwg

icon 2-я сек. квартиры.исправл.урезанdwg.dwg

2-я сек. квартиры.исправл.урезанdwg.dwg

icon 2-я секция квартиры.исправленныеdwg.dwg

2-я секция квартиры.исправленныеdwg.dwg

icon 2Этаж30,62.dwg

2Этаж30,62.dwg

icon ванная25.dwg

ванная25.dwg

icon Вент.камеры33,65.dwg

Вент.камеры33,65.dwg

icon Диспетчерская20.dwg

Диспетчерская20.dwg

icon Лист 21 Насосная.dwg

Лист 21 Насосная.dwg

icon Лист 21 Тепловой пунк.dwg

Лист 21 Тепловой пунк.dwg

icon Лист16 Электрощитовая№1.dwg

Лист16 Электрощитовая№1.dwg

icon Лист17 КабельноеПомещение№1.dwg

Лист17 КабельноеПомещение№1.dwg

icon Лист18 Электрощитовая№2.dwg

Лист18 Электрощитовая№2.dwg

icon Лист19 КабельноеПомещение№2.dwg

Лист19 КабельноеПомещение№2.dwg

icon Лист23,24уравнивание потенциалов.dwg

Лист23,24уравнивание потенциалов.dwg

icon Лист26Световое ограждение.dwg

Лист26Световое ограждение.dwg

icon Лист27Молниезащита.dwg

Лист27Молниезащита.dwg

icon Лист27Система уравнивания потенциалов.dwg

Лист27Система уравнивания потенциалов.dwg

icon ПовалЛист28,60.dwg

ПовалЛист28,60.dwg

icon Пом.лифтов34,35,66,67.dwg

Пом.лифтов34,35,66,67.dwg

icon Внешнее электроснабжение.cdw

Внешнее электроснабжение.cdw

icon ГРЩ-1-23.09.06.cdw

ГРЩ-1-23.09.06.cdw

icon ГРЩ-2-23.09.06.cdw

ГРЩ-2-23.09.06.cdw

icon Штамп.cdw

Штамп.cdw

icon ЩД(диспетчер)2-я категория.cdw

ЩД(диспетчер)2-я категория.cdw

icon Щит арендаторов№1.cdw

Щит арендаторов№1.cdw

icon Щит арендаторов№2.cdw

Щит арендаторов№2.cdw

icon Щит ОПС.cdw

Щит ОПС.cdw

icon ЩКД(диспетчер).cdw

ЩКД(диспетчер).cdw

icon ЩКобщ..cdw

ЩКобщ..cdw

icon ЩЭ-Схема1.1.cdw

ЩЭ-Схема1.1.cdw

icon ЩЭ-Схема1.cdw

ЩЭ-Схема1.cdw

icon ЩЭ-Схема2.1.cdw

ЩЭ-Схема2.1.cdw

icon ЩЭ-Схема2.2.cdw

ЩЭ-Схема2.2.cdw

icon ЩЭ-Схема2.cdw

ЩЭ-Схема2.cdw

icon типовой этаж31,63.dwg

типовой этаж31,63.dwg

icon ЧЕРДАК Лист 32,64.dwg

ЧЕРДАК Лист 32,64.dwg

Free downloading for today

Update after: 15 hours 31 minutes
up Up