• RU
  • icon Waiting For Moderation: 10
Menu

Industrial one-story building - AR

  • Added: 09.07.2014
  • Size: 1 MB
  • Downloads: 2
Find out how to download this material

Description

Course project: plan, sections, nodes, general plan, explanatory note

Project's Content

icon
icon
icon Оглавление.doc
icon пояснительная.doc
icon
icon лист 2004.dwg
icon лист2 2004.dwg
icon Лист3 2004.dwg

Additional information

Contents

1. Introduction

2. Master Plan

3. Process

4. Features

5. Calculation of natural illumination of industrial building

6. Calculation of household equipment

7. Technical and economic indicators

List of used literature

2. Master Plan

The entire production territory of an industrial enterprise is divided into 4 zones:

Pre-factory, including factory auxiliary buildings designed to accommodate the administration, medical institutions, educational premises, premises for public organizations and cultural services, laboratories, research units, aisles, parking lots for passenger transport, etc.;

Production, in which production shops of the main and auxiliary purpose are concentrated;

Utility room, in which energy facilities, ground and underground engineering communications are located;

Warehouse, there are buildings for storing materials, semi-finished products and finished products, as well as transport buildings and structures.

Technical - economic indicators of the general plan

Plot area 104942 m ²

Building area 5277.96 m ²

Asphalt cover area 12593.04 m ²

Area of ​ ​ railways 220.5 m ²

Landscaping area 10059.84 m ²

Building factor 0.05

Coating factor 0.12

Greening factor 0.09

3. Process

Main premises of the workshop:

1. Transport area (Ia)

2. Procurement Warehouse (Ia)

3. Metal Cold Machining Zone (Ib)

4. Intermediate Part Warehouse (Ia)

5. Metal Heat Treatment Zone (IIb)

6. Intermediate Part Warehouse (Ia)

7. Painting compartment (IIb)

8. Finished goods warehouse (Ia)

9. Finished Goods Control and Export Area (Ia)

Metal Cold Machining Zone

Metal is processed on strict, long, drilling, turning, milling, grinding and other machines, as well as sharpening and editing of the cutting tool.

The processes belong to the Ib manufacturing process group.

Metal Heat Treatment Zone

Heat treatment of metal includes annealing, normalization, quenching, tempering, cementation, cyanidation, metal nitriding and other operations.

Processes belong to IIB group of production processes.

Painting department

To protect products from corrosion and rotting, as well as to give them a decorative appearance in the machine building industry, the following painting materials are used: oil paints, which are a mixture of dry pigments (lead suck, lead oxide, etc.) and fillers (talc, chalk, kaolin, spar) with film-forming substances (olefins) and solvents (whitespirite, solvent, skipar, etc.) asphalt-bitumen varnishes and paints, which are solutions of bitumen in organic solvents; glyphthalic varnishes and enamels made on the basis of glyphthalic resins that dissolve in solvents (whitespyrite, solvent, xylene, etc.); pentaphthalic enamels made from polyester resins and solvents (solvent, xylene, etc.); perchlorovinyl enamels, which are solutions of perchlorovinyl resin in organic solvents (butyl acetate, ethyl acetate, acetone, toluene, etc.); nitrocellulose enamels and varnishes based on nitrolacs colored with various pigments; water emulsion paints such as polyvinyl acetate and butadiene styrene; synthetic enamels.

Processes belong to Group III of production processes.

The total area of ​ ​ the workshop is 4320 m ³

Drawings content

icon лист 2004.dwg

лист 2004.dwg

icon лист2 2004.dwg

лист2 2004.dwg

icon Лист3 2004.dwg

Лист3 2004.dwg

Free downloading for today

Update after: 51 minutes
up Up