Exchange rate in the discipline of LBC, calculation of the column of the extreme row, calculation of the railway truss, calculation of the frame. Drawing + Note

Project's Content

icon
icon PZ_1.docx
icon Chertezh_1.dwg

Additional information

Load collection on the frame

Depending on the duration of the loads, constant and temporary loads are distinguished. The permanent loads on the truss include the adopted coating design, the dead weight of the paving plates, and the dead weight of the truss.

Reinforced concrete ribbed slabs are used as coating structures. Overall dimensions of plates: 12000 * 1500 mm.

Temporary loads include snow loads.