Industrial building, course design 3rd course of ASG
- Added: 29.01.2016
- Size: 5 MB
- Downloads: 3
Description
Course project on architecture on industrial buildings. The archive includes drawings and explanatory note to the project. Composition of archive AB.dwg KursovikPromZdanie.dwg Explanatory not1.doc
Project's Content
|
АБК.dwg
|
КурсовикПромЗдание.dwg
|
Пояснительная записка1.doc
|
Additional information
Contents
Contents:Introduction:
General part:
1.1 Construction area
1.2 Volumetric-planning and structural solutions
1.3 Master Plan
Architectural and construction part:
2.1 Foundations
2.2 Columns
2.3 Rafters
2.4 Coatings
2.5 Canopies
2.6 Crane beams
2.7 Walls
2.8 Corrosion and antiseptic measures
2.9 Exterior and Interior Finishes
2.10 List of floors
2.11 Communications
2.12 Windows, gates, doors
2.13 Lighting calculation
2.14 Calculation of administrative premises
2.15 Environmental measures
General part:
1.1 Initial data and construction area
The designed industrial building is located in Lipetsk
Climatic region - II
Climate Subdistrict - IIB
Air temperature of coldest days, ° С -38
Air temperature of the coldest five days, ° С -27
Heating period duration, days - 202
Average monthly relative humidity of the coldest month,% - 85
Average monthly relative air humidity of warmest month,% - 66
Rainfall for April - October, mm - 382
Rainfall for November - March, mm - 248
The prevailing wind direction for December - February - SZ
Prevailing wind direction for June - August - NW
Minimum of average wind speeds per rumba for July, m/s - 4.1
The maximum of the average wind speeds in rumbes in January, m/s, is 5.9
Data are taken for SNiP 230199 "Construction climatology," Table 1 - Climatic parameters of the cold period of the year, Table 2 - Climatic parameters of the warm period of the year.
Standard wind speed - 30 kg/m2
Design snow load - 120 kg/m2
Data are taken as per SNiP 2.01.07-85 "Loads and impacts."
Functional fire hazard class - F 5.1
Structural fire hazard class - C0
Fire resistance rating of the building - I
Data taken as per SNiP 210197 "Fire safety of buildings and structures"
Master Plan
The designed area is 300x300m. The master plan is made according to the type of depth layout, taking into account the location of the site, technological processes, traffic flows and terrain.
The production territory of an industrial enterprise is divided into four zones:
1) Pre-factory, includes auxiliary buildings designed to accommodate the administration, medical institutions, laboratories, household buildings, aisles, parking lots for transport.
2) Production, in which production workshops of the main and auxiliary purpose are concentrated.
3) Utility room, in which energy facilities, underground and ground engineering communications are located.
4) Warehouse, which houses buildings for the storage of materials, blanks, finished products, transport buildings and structures.
On the designed master plan, the connection between individual zones corresponds to the technological process, and the production flow has the smallest length.
The following buildings and structures are designed in the pre-factory zone: a checkpoint, a canteen, a medical institution, an administrative building, a car parking with a capacity of 120 cars and a railway control room. In the production area there is a tool and stamping shop, repair vehicles and technical equipment. In a subsidiary zone the combined heat and power plant and power plant are located.
The plan shows the routing of roads and highways and designed pedestrian and passenger tracks that do not intersect with freight tracks.
According to the vertical layout, all structures are located in the ground and above-ground zones.
The master plan has been completed according to all requirements in accordance with SNI8980 * "Master Plans of Industrial Enterprises" and GOST 21.50893 "Rules for Execution of Working Documentation of Master Plans of Enterprises, Structures and Housing and Civil Facilities"
АБК.dwg
КурсовикПромЗдание.dwg