Heating Boiler House
- Added: 09.08.2014
- Size: 4 MB
- Downloads: 0
Description
PZ1 - Materials for obtaining natural gas limits PZ- general explanatory note on NPP project - Architectural and construction solutions
Project's Content
|
|
|
Ведомость рабочих чертежей л.1.cdw
|
Общие указания л.1.cdw
|
Опоры О3-О8 л.14.cdw
|
План колонн,разрезы 1-1 - 5-5, узлы1.2. КМ л.1.cdw
|
План кровли л.9.cdw
|
План на отм. 0,00,разрез 1-1,узлы. л.6.cdw
|
План фундаментов. Ф-1,Ф-2,Ф-3 л.4.cdw
|
Площадка обслуживания котлов л.10.cdw
|
Разрез1-1, 2-2. Опоры 5,6.dwg
|
Разрез4-4 Опоры.dwg
|
Разрезы 1-1 - 7-7,Кронштейны Кр1 - Кр3. КМ л.2.cdw
|
Раскладка панелей покрытия л.8.cdw
|
Раскладка стеновых панелей л.7.cdw
|
Устройство раскосов для крепления дымоходов. л.4КМ.cdw
|
Фасады по оси А,1 л.2.cdw
|
Фасады по оси Б,4 л.3.cdw
|
Фундамент Ф-2,Ф-3.cdw
|
Фундаменты под оборудование. Опоры. л.11.cdw
|
|
Заказная спецификация л.1.cdw
|
Заказная спецификация л.2.cdw
|
Заказная спецификация л.3.cdw
|
Об данные л1.1.cdw
|
Об. дан. ГСВ л.1.2 .cdw
|
Опора напольная О-1. Приложение.cdw
|
План на отм. 0,000 .cdw
|
Ситуационный план. план газопровода от ПГБ до котельной. Разрез А-А..cdw
|
Схема газопроводов котельной. Вид А..cdw
|
Шкаф-укрытие для отсечного клапана типа ВН. Приложение..cdw
|
|
Колонна К3-К7.cdw
|
л.1 Колонна К1,К2.cdw
|
л.2 Колонна К3-К7н.cdw
|
л.3 Балки Б1,Б2 н (1).cdw
|
л.4 Связь Сг1 н1.cdw
|
л.5 Связь Св1н.cdw
|
л.6 Ворота 1.cdw
|
л.7 Дверь Дм-1.cdw
|
План перекрытия без узла покрытия.л3 км.cdw
|
Связь Сг1 н.cdw
|
|
ПЗ-титул.doc
|
Пояснительная записка.doc
|
|
Пояснительная записка.doc
|
Приложение А .doc
|
Приложение Г .xls
|
|
Бак технологических сливов. л.И1.dwg
|
Вид А. л.10.dwg
|
Общие данные. л.1,2.dwg
|
План котельной. л. 3.dwg
|
План разводки технологических трубопроводов. л. 5.dwg
|
Принципиальная схема. л.4.dwg
|
Разрез 3-3. л.8.dwg
|
Разрез1-1, 2-2. л.7.dwg
|
Разрез4-4. л.9.dwg
|
Слив от технологического оборудования л.11.dwg
|
Спецификация. л.СО1-СО5.dwg
|
Схема разводки технологических трубопроводов. л.6.dwg
|
Техномонтажная ведомость теплоизоляции. л.12.dwg
|
|
лист 1. Спецификация (с АВР).cdw
|
лист 1.Общие данные (с АВР).cdw
|
лист 10-1.Схема уравнивания потенциалов (начало) с АВР.cdw
|
лист 10-2.Схема уравнивания потенциалов (окончание) с АВР.cdw
|
лист 2. Спецификация (с АВР).cdw
|
лист 2. Шкаф АВР. Поясняющая схема подключений (c АВР).cdw
|
лист 3. Спецификация (с АВР).cdw
|
лист 3. Шкаф ШР-1. Однолинейная схема 0,4кВ (c АВР).cdw
|
лист 4. Спецификация (с АВР).cdw
|
лист 4. Шкаф ШР-2. Однолинейная схема 0,4кВ (с АВР).cdw
|
лист 5-1. Разводка труб,кабелей ( с АВР).cdw
|
лист 5-2. Разводка труб,кабелей. Разрез1 (с АВР).cdw
|
лист 5. Спецификация (с АВР).cdw
|
лист 6-1. Кабельно-трубный журнал (с АВР).cdw
|
лист 6-2. Кабельно-трубный журнал (с АВР).cdw
|
лист 7.План сети освещения (с АВР).cdw
|
лист 8. Заземляющее устройство. Расчет (с АВР).cdw
|
лист 9. Молниезащита. Расчет (с АВР).cdw
|
Additional information
Contents
1. GENERAL PART
2. FUEL DEMAND CALCULATION METHODOLOGY
3. CONCLUSIONS
Applications:
Appendix A - Appendix to the letter of the Ministry of Economy of Russia No. VE-261/25-510 dated 27.
Appendix B - Letter of OJSC MMK No. UGE-0421-45 dated 22.03.2006 on the possibility of using natural gas for ZAO xxxx
Appendix B - Initial data for calculation of fuel demand for boiler house of CJSC "xxxxxx"
Appendix D - Calculation of maximum annual heat consumption
1. common part
The main activity of CJSC "xxxxx" is the provision of metal charge of OJSC "xxx."
Koprov workshop of CJSC "xxxxx" is located in the left-bank part of the city south of the industrial site of the CHP OJSC "xxxx." There are a number of production buildings and structures and an administrative and household building on the territory of Copra Workshop No. x.
The local boiler house under construction serves for heating, ventilation and hot water supply to the facilities of lump shop No. x of CJSC xxxxx.
It is planned to install 2 Vitoplex100 1750 kW boilers from Viessmann (Germany) operating on natural gas in the boiler room.
Letter No. UGExxxx dated 22.03.2006 was received from OJSC xxx. consent to gas consumption for gas supply of boiler house and process units of lump shop № x of CJSC "xxxx" (Appendix B).
Heat consumers of lump shop No. x of CJSC "xxxxx" and their estimated hour costs for heating ventilation and hot water supply are given in Appendix B.
2. conclusions
As a result of the calculations, it was established:
- annual fuel consumption in 2007 will be 1.48 thousand tons/year (1292.59 thousand nm3/year of natural gas).
Ведомость рабочих чертежей л.1.cdw
Общие указания л.1.cdw
Опоры О3-О8 л.14.cdw
План колонн,разрезы 1-1 - 5-5, узлы1.2. КМ л.1.cdw
План кровли л.9.cdw
План на отм. 0,00,разрез 1-1,узлы. л.6.cdw
План фундаментов. Ф-1,Ф-2,Ф-3 л.4.cdw
Площадка обслуживания котлов л.10.cdw
Разрез1-1, 2-2. Опоры 5,6.dwg
Разрез4-4 Опоры.dwg
Разрезы 1-1 - 7-7,Кронштейны Кр1 - Кр3. КМ л.2.cdw
Раскладка панелей покрытия л.8.cdw
Раскладка стеновых панелей л.7.cdw
Устройство раскосов для крепления дымоходов. л.4КМ.cdw
Фасады по оси А,1 л.2.cdw
Фасады по оси Б,4 л.3.cdw
Фундамент Ф-2,Ф-3.cdw
Фундаменты под оборудование. Опоры. л.11.cdw
Заказная спецификация л.1.cdw
Заказная спецификация л.2.cdw
Заказная спецификация л.3.cdw
Об данные л1.1.cdw
Об. дан. ГСВ л.1.2 .cdw
Опора напольная О-1. Приложение.cdw
План на отм. 0,000 .cdw
Ситуационный план. план газопровода от ПГБ до котельной. Разрез А-А..cdw
Схема газопроводов котельной. Вид А..cdw
Шкаф-укрытие для отсечного клапана типа ВН. Приложение..cdw
Колонна К3-К7.cdw
л.1 Колонна К1,К2.cdw
л.2 Колонна К3-К7н.cdw
л.3 Балки Б1,Б2 н (1).cdw
л.4 Связь Сг1 н1.cdw
л.5 Связь Св1н.cdw
л.6 Ворота 1.cdw
л.7 Дверь Дм-1.cdw
План перекрытия без узла покрытия.л3 км.cdw
Связь Сг1 н.cdw
Бак технологических сливов. л.И1.dwg
Вид А. л.10.dwg
Общие данные. л.1,2.dwg
План котельной. л. 3.dwg
План разводки технологических трубопроводов. л. 5.dwg
Принципиальная схема. л.4.dwg
Разрез 3-3. л.8.dwg
Разрез1-1, 2-2. л.7.dwg
Разрез4-4. л.9.dwg
Слив от технологического оборудования л.11.dwg
Спецификация. л.СО1-СО5.dwg
Схема разводки технологических трубопроводов. л.6.dwg
Техномонтажная ведомость теплоизоляции. л.12.dwg
лист 1. Спецификация (с АВР).cdw
лист 1.Общие данные (с АВР).cdw
лист 10-1.Схема уравнивания потенциалов (начало) с АВР.cdw
лист 10-2.Схема уравнивания потенциалов (окончание) с АВР.cdw
лист 2. Спецификация (с АВР).cdw
лист 2. Шкаф АВР. Поясняющая схема подключений (c АВР).cdw
лист 3. Спецификация (с АВР).cdw
лист 3. Шкаф ШР-1. Однолинейная схема 0,4кВ (c АВР).cdw
лист 4. Спецификация (с АВР).cdw
лист 4. Шкаф ШР-2. Однолинейная схема 0,4кВ (с АВР).cdw
лист 5-1. Разводка труб,кабелей ( с АВР).cdw
лист 5-2. Разводка труб,кабелей. Разрез1 (с АВР).cdw
лист 5. Спецификация (с АВР).cdw
лист 6-1. Кабельно-трубный журнал (с АВР).cdw
лист 6-2. Кабельно-трубный журнал (с АВР).cdw
лист 7.План сети освещения (с АВР).cdw
лист 8. Заземляющее устройство. Расчет (с АВР).cdw
лист 9. Молниезащита. Расчет (с АВР).cdw
Similar materials
- 04.11.2022
- 24.01.2023