General view of SHCHOM-1200
- Added: 28.05.2014
- Size: 2 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The SHCHOM-1200 crushed stone cleaning complex is designed for: cleaning of crushed stone ballast from cloggers on stretches, station tracks, including at platforms, with selection to specialized rolling stock; sealing the cut surface before laying geotextile or polystyrene foam plates; and laying the cleaned ballast under the track grid layer-by-layer with compaction of the bottom layer.
Project's Content
|
Общий вид ЩОМ-1200.cdw
|
Additional information
Drawings content
Общий вид ЩОМ-1200.cdw
Similar materials
Free downloading for today
Update after: 15 hours 43 minutes