Gas supply to the district of the city and residential building
- Added: 09.08.2014
- Size: 208 KB
- Downloads: 1
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Explanatory Note includes all calculations and A1DWG drawing
Project's Content
|
|
газоснабжение генплан.dwg
|
КР ГазоснабжениеДРР.doc
|
Additional information
Source Data:
1. Gasified settlement: Izhevsk
2. General plan number of the construction area: 3
3. Type of pavement of driveways and sidewalks: improved
4. Population density in the construction area: 370 people/ha
5. External volume of residential buildings per 1 person: 52m3
6. Gas field: Orenburg
7. Gas pressure at the point of connection of the city gas network to the GPC: 0.5 MPa
8. Distance from GRS to city gas network: 7 km
9. Location of the GRS relative to the city area: JV
Drawings content
газоснабжение генплан.dwg
Similar materials
- 14.05.2016
- 25.10.2021
- 09.07.2014
- 30.04.2022
- 24.01.2023
Free downloading for today
Update after: 10 hours 11 minutes