• RU
  • icon Waiting For Moderation: 2
Menu

Expansion of an existing 220 kW substation

  • Added: 28.02.2026
  • Size: 17 MB
  • Downloads: 0

Description

Expansion of an existing 220 kW substation

Project's Content

icon General Layout AIS 220 kV (2).dwg
The material is a file that can be opened in program:
  • AutoCAD or DWG TrueView

Free downloading for today

Update after: 9 hours 8 minutes
up Up