STEP-DOWN SUBSTATION 220/35/10 kV WITH THE DEVELOPMENT OF AN INDIVIDUAL PART OF THE PROJECT ANALYSIS OF LIGHTNING PROTECTION OF 220 kV WIU
- Added: 11.05.2022
- Size: 3 MB
- Downloads: 2
Description
The purpose of the thesis is the practical application of theoretical knowledge, the formation of skills for designing electrical devices and solving specific engineering problems.
The thesis provides for the selection of the main power equipment of the substation switchgear, the development of a single-line scheme of the main electrical connections of the substation and the substation plan with the placement of the main power equipment, the calculation of parameters and the choice of equipment for the substation's own needs, the calculation of the grounding device.
The design of power supply devices is based on the requirement to ensure reliable and economical operation of electrical installations. Making design decisions is carried out on the basis of standard projects. In this thesis, a desoldering step-down substation will be calculated.
Project's Content
Чертежи.vsd
|
ПЗ.docx
|