Exchange rate for reconstruction a/d
- Added: 27.05.2021
- Size: 3 MB
- Downloads: 0
Description
Exchange rate for reconstruction a/d
Project's Content
5. Производительность и объемы.docx
|
4.1.Спец.потоки.docx
|
4. 3 раздел.docx
|
8. План потока Реконструкия.dwg
|
7.1.2. Календарный график.pdf
|
2. Профили.doc
|
2.1.2. Поперечники совмещенные.pdf
|
3.1. Расчет ДО.xls
|
план потока Реконструкия.bak
|
7.1. Календарный график реконструкция.dwg
|
поперечники жустарева.bak
|
Календарный график реконструкция.bak
|
6. Тех.карта и Ганта.xlsx
|
8.1. План потока Мотин.pdf
|
3.2.2. Конструкция дорожной одежды.pdf
|
3. Дор.одежда.doc
|
1. Климат.doc
|
3.2. ДО жустарева.dwg
|
7. Календарный график расчет.docx
|
2.1. Поперечники жустарева.dwg
|
plot.log
|
2.1.1. Поперечники.pdf
|
Additional information
Contents
CONTENTS
1. ASSESSMENT OF NATURAL AND CLIMATIC CONDITIONS OF THE WORK AREA
2. DESIGN AND PLANNING SOLUTIONS OF THE RECONSTRUCTED FACILITY
2.1. Analysis and comparison of technical characteristics before and after reconstruction of the facility
2.1. Design and planning solutions for the cross section of the roadbed
2.2. Design of widening of roadway structure
3. MAIN PROVISIONS OF ROAD RECONSTRUCTION TECHNOLOGY AND ORGANIZATION
3.1. List of main process operations to expand the roadbed
3.2. List of main technological operations for reconstruction of road paving
3.3. List of main technological operations for reconstruction of the elements of arrangement and organization of traffic
3.4. Determine the duration of specialized threads
4. DEVELOPMENT OF EARTH BED RECONSTRUCTION TECHNOLOGY
4.1. Determining the Pace of Excavation Reconstruction
4.2.. Determination of excavation quantities
4.3. Calculation of road machine performance by process operations
4.4. Development of the Roadbed Reconstruction Task List and Preparation of the Hourly Ribbon Schedule
4.5. Roadway Renovation Flow Plan
4.6. Work Schedule for the Reconstruction of the Roadway
5. ORGANIZATION OF TRAFFIC IN THE AREA OF RECONSTRUCTION WORKS
6. QUALITY CONTROL OF WORKS PERFORMANCE
3. Main provisions of road reconstruction technology and organization
3.1. General provisions on organization of works.
Organization of traffic in the work area:
completely close the road for traffic, allowing traffic flows on bypass roads (work is carried out in one direction);
carry out work on one half of the road, moving traffic to the second half of the carriageway and the side of the road (work is carried out in forward and reverse direction).
It is accepted that the road is completely closed to traffic.
The working week is 7 days, the shift duration is 10 hours, since the shift method of construction is adopted.
8. План потока Реконструкия.dwg
7.1. Календарный график реконструкция.dwg
3.2. ДО жустарева.dwg
2.1. Поперечники жустарева.dwg