• RU
  • icon Waiting For Moderation: 27
Menu

Exchange rate for reconstruction a/d

  • Added: 27.05.2021
  • Size: 3 MB
  • Downloads: 0
Find out how to download this material

Description

Exchange rate for reconstruction a/d

Project's Content

icon 5. Производительность и объемы.docx
icon 4.1.Спец.потоки.docx
icon 4. 3 раздел.docx
icon 8. План потока Реконструкия.dwg
icon 7.1.2. Календарный график.pdf
icon 2. Профили.doc
icon 2.1.2. Поперечники совмещенные.pdf
icon 3.1. Расчет ДО.xls
icon план потока Реконструкия.bak
icon 7.1. Календарный график реконструкция.dwg
icon поперечники жустарева.bak
icon Календарный график реконструкция.bak
icon 6. Тех.карта и Ганта.xlsx
icon 8.1. План потока Мотин.pdf
icon 3.2.2. Конструкция дорожной одежды.pdf
icon 3. Дор.одежда.doc
icon 1. Климат.doc
icon 3.2. ДО жустарева.dwg
icon 7. Календарный график расчет.docx
icon 2.1. Поперечники жустарева.dwg
icon plot.log
icon 2.1.1. Поперечники.pdf

Additional information

Contents

CONTENTS

1. ASSESSMENT OF NATURAL AND CLIMATIC CONDITIONS OF THE WORK AREA

2. DESIGN AND PLANNING SOLUTIONS OF THE RECONSTRUCTED FACILITY

2.1. Analysis and comparison of technical characteristics before and after reconstruction of the facility

2.1. Design and planning solutions for the cross section of the roadbed

2.2. Design of widening of roadway structure

3. MAIN PROVISIONS OF ROAD RECONSTRUCTION TECHNOLOGY AND ORGANIZATION

3.1. List of main process operations to expand the roadbed

3.2. List of main technological operations for reconstruction of road paving

3.3. List of main technological operations for reconstruction of the elements of arrangement and organization of traffic

3.4. Determine the duration of specialized threads

4. DEVELOPMENT OF EARTH BED RECONSTRUCTION TECHNOLOGY

4.1. Determining the Pace of Excavation Reconstruction

4.2.. Determination of excavation quantities

4.3. Calculation of road machine performance by process operations

4.4. Development of the Roadbed Reconstruction Task List and Preparation of the Hourly Ribbon Schedule

4.5. Roadway Renovation Flow Plan

4.6. Work Schedule for the Reconstruction of the Roadway

5. ORGANIZATION OF TRAFFIC IN THE AREA OF RECONSTRUCTION WORKS

6. QUALITY CONTROL OF WORKS PERFORMANCE

3. Main provisions of road reconstruction technology and organization

3.1. General provisions on organization of works.

Organization of traffic in the work area:

completely close the road for traffic, allowing traffic flows on bypass roads (work is carried out in one direction);

carry out work on one half of the road, moving traffic to the second half of the carriageway and the side of the road (work is carried out in forward and reverse direction).

It is accepted that the road is completely closed to traffic.

The working week is 7 days, the shift duration is 10 hours, since the shift method of construction is adopted.

Drawings content

icon 8. План потока Реконструкия.dwg

8. План потока Реконструкия.dwg

icon 7.1. Календарный график реконструкция.dwg

7.1. Календарный график реконструкция.dwg

icon 8.1. План потока Мотин.pdf

icon 3.2.2. Конструкция дорожной одежды.pdf

icon 3.2. ДО жустарева.dwg

3.2. ДО жустарева.dwg

icon 2.1. Поперечники жустарева.dwg

2.1. Поперечники жустарева.dwg

icon 2.1.1. Поперечники.pdf

up Up