Electrolobedka - course
- Added: 01.07.2014
- Size: 1 MB
- Downloads: 0
Description
Project's Content
|
КП_ДМ_О_Д2.doc
|
Лебёдка.bak
|
Лебёдка.cdw
|
Редуктор.bak
|
Редуктор.cdw
|
Additional information
Contents
1. Design Brief
2. Electric drive diagram and initial data
2.1 Determination of total operating time
2.2 Definition of Class of Use
2.3 Determination of loading class
2.4 Definition of operating mode group
3 Calculation of flexible element
3.1 Determination of polyspast efficiency
3.2 Determination of maximum tension of rope leg
4.3 Selection of standard rope
4 Calculation of hook suspension
4.1 Selection of standard hook
4.2 Calculation of movable unit
4.3 Calculation of crossbeam
5 Drum calculation
5.2 Calculation of rope attachment
6. Kinematic and power calculation of the drive
6.1 Calculation of items drive
6.2 Electric motor selection
6.3 Determination of drive gear ratio
6.4 Calculation of power, angular speeds and torques on all drive shafts
7. Calculation of V-belt transmission
7.1 Initial data and calculation diagram
7.2 Calculation of main transmission parameters
7.3 Calculation of Shaft Load
7.4 Verification calculation
7.5 Determining the main parameters of pulleys
8. Gearbox cylindrical stage calculation
8.1 Initial data and design diagram
8.2 Material and Heat Treatment Selection
8.3 Calculation of permissible stresses
8.4 Transmission Design Calculation
8.5 Transmission check calculation
8.6 Calculation of forces in engagement
9. Gearbox Sketch Layout and Bearing Selection
9.1 Determination of basic dimensions of gearbox housing elements
9.2 Design Design of Shafts and Type of Bearings
9.3 Structural dimensions of wheels
9.4 Gearbox Preassembly
9.5 Drawing up a diagram of joint loading of shafts
9.6 Compilation of the design diagram of the shaft and determination of the reaction of supports
9.7 Selection of rolling bearings by dynamic lifting capacity
9.8 Final gearbox layout
10 Selection of lubricant and seals
10.1 Selection of lubrication method of engagement and bearing units
10.2 Choice of oil grade
10.3 Calculation of oil bath volume and oil level
10.4 Selection of device for oil level filling and monitoring
11. Coupling calculation
11.1 Selection of standard coupling
11.2 Check calculation of coupling with sketches for calculation
12 Assembly and Adjustment Procedure
12.1 Gearbox Assembly Procedure
12.2 Procedure for adjustment of engagement and clearances in bearings
12.3 Procedure for Assembly and Adjustment of the Drive
13 Literature
12. Gearbox assembly and adjustment procedure
12.1 Gearbox Assembly Procedure
Before assembly, the internal cavity of the reduction gear box housing is thoroughly cleaned and covered with oil-resistant paint .
Assembly is performed in accordance with gearbox assembly drawing starting from shafts .
We lay keys on the driving, intermediate and driven shafts. Press the gear wheel on the driven shaft, put on spacer sleeves to fix the wheels and gears in the axial direction.
Then we put oil retaining rings on the shafts and put ball bearings pre-heated in oil at a temperature of up to 80-100 degrees.
We put a sleeve on the bearings of the high-speed shaft.
The assembled shafts are placed in the corresponding slots of the gear box housing. Then we cover the surface of the flange joint with alcohol varnish and put on the cover of the housing. To prevent unscrewing of bolts, the cover is installed on the housing using two conical pins and tightens the bolts .
After that plastic grease is put on shafts in bearing chambers. Install intermediate washers in the intermediate shaft assembly. Install bearing covers with a set of metal gaskets. Before installation of through covers into covers, let us pull cuffs. Screw adjustment screws in the intermediate shaft assembly. By turning the shafts make sure that there is no jamming (shafts must be turned by hand) and attach the covers with screws.
Then install the plug of oil outlet with gasket, install the lamp oil indicator with gasket.
Pour oil into the housing and close the inspection hole with a cover with a gasket made of technical cardboard; attach the cover with bolts.
The assembled gearbox is rolled and tested on the bench according to the program established by technical conditions.
12.2 Procedure for adjustment of engagement and clearances in bearings
Gear width is made larger than gear width by 5 mm to compensate for assembly errors relative to axial position of wheels. Adjustment screws are provided to adjust the intermediate shaft.
Adjustment of clearances in bearings is performed by a set of thin mechanical gaskets installed under flanges of bearing covers.
12.3 Procedure for Assembly and Adjustment of the Drive
Install the electric motor on the frame and bolt it. We put a half-coupling on the electric motor shaft, press the other half-coupling on the input shaft of the reduction gear box, before laying the key. Install the reduction gear box on the common frame near the motor frame drive and twist. We collect half a coupling. Put the key in the output shaft and press the driving pulley. Screw the bolt with washer into the shaft end face. For that attach sprocket from axial movement. Driven sprocket is pressed onto conveyor shaft by means of bolt with nut. Put on a belt. The chain tension is controlled by a periodic tensioner.
Лебёдка.cdw
Редуктор.cdw
Similar materials
- 29.05.2015
- 11.05.2018
- 19.03.2017