Diploma project on the topic "Warehouse of finished products"
- Added: 04.10.2023
- Size: 12 MB
- Downloads: 5
Description
Diploma project of the CSP on the topic "Warehouse of finished products"
1. Explanatory note
CONTENT
INTRODUCTION.. 9
1. ARCHITECTURAL AND CONSTRUCTION SECTION. 11
1.1 Master Plan. 11
1.2 Space-planning and architectural-compositional solution. 12
1.3 Design. 13
1.4 Thermal design of the outer fence. 14
1.5. Exterior and interior decoration. 18
1.6 Sanitary and engineering equipment. 18
2. DESIGN SECTION. 20
2.1. Engineering and geological conditions of the construction site. 20
2.1.1. Knowledge of engineering and geological conditions. 20
2.1.2. Physical, geographical and technogenic conditions. 20
2.1.3. Geological structure and properties of soils. 23
2.1.4. Results of engineering and geological surveys. 24
2.2. Structural Analysis and Design. 28
2.2.1. Structural solutions. 28
2.2.2. Calculation of a metal truss. 28
2.3. Calculation of foundations and design of foundations. 46
2.3.1. General Information. 46
2.3.2 Selection of the depth of the foundation. 50
2.3.3 Determination of pile load-bearing capacity. 51
2.3.4 Determination of the number of piles in the foundation and their placement in the grillage plan 53
2.3.5 Determination of foundation settlement. 54
3. ORGANIZATIONAL AND TECHNOLOGICAL SECTION. 56
3.1. Organization of construction production. 56
3.2. Construction Technology. 56
3.2.2. Technological map for the performance of works on the installation of foundations. 57
3.2.2.1. General data. 57
3.2.2.2. Calculation of labor costs and wages. 58
3.2.2.3. Selection of technological equipment. 59
3.2.2.4. Selection of the master machine. 59
3.2.2.5. Feasibility studies of the selected option. 60
3.2.2.6. Selection of an integrated team. 61
3.2.2.7. Instructions for the execution of works. 63
3.2.2.8. Requirements for the quality of work on the installation of foundation slabs and blocks. 64
3.2.5. Construction master plan. 64
3.2.5.1. General Provisions. 64
3.2.5.2. Calculation of labor inputs. 65
3.2.5.3. Calculation of household premises. 71
3.2.5.4. Calculation of warehouses. 72
3.2.5.5. Calculation of temporary water supply. 73
3.2.5.6. Calculation of temporary power supply. 75
3.3. Ecology of Construction. 77
3.3.1 General Provisions. 77
3.3.2 Environmental safety measures. 78
3.3.3. Restoration and improvement of the territory after the completion of the construction of the warehouse. 79
3.4. Occupational health and safety. 79
3.4.1. General Provisions. 79
3.4.2. Transport and loading and unloading operations during warehouse construction. 80
3.4.3 Requirements for the storage of materials and structures on the territory of the warehouse. 83
3.4.4 Ensuring fire safety during the construction of a warehouse. 83
3.5. Economics of Construction. 84
CONCLUSION.. 87
REFERENCES... 89
2. Drawings you autocade
- Situational plan, perspective, master plan, explication of buildings and structures
Sections
- Section 2-2, Section 1-1, roof plan
- Construction Master Plan
- Layout of monolithic grillages and foundation beams
- Ground floor plan, second floor plan, section 3-3, section 4-4
- Work schedule
- Pile layout
- Technical map for the installation of bored piles
3. Cost estimate
Project's Content
ФБб-ПГС-181 Иванников А. А..dwg
|
Сводная таблица.xls
|
ПЗ Иванников А.А..docx
|