• RU
  • icon Waiting For Moderation: 7
Menu

Diploma project of sports center

  • Added: 29.07.2014
  • Size: 5 MB
  • Downloads: 7
Find out how to download this material

Description

Full diploma project 7 sheets (2 sheets of architecture, 2 sheets of structures, 3 sheets of OSP) + explanatory notes to all three sections

Project's Content

icon
icon
icon Лист 1(архитектура).dwg
icon Лист 2 (архитектура).dwg
icon Лист 3 (конструкции).dwg
icon Лист 4 (конструкции).dwg
icon Лист 6 (ТОСП).dwg
icon Лист5 (ТОСП).dwg
icon Лист7 (ТОСП).dwg
icon Пояснительная Архитектура.doc
icon Пояснительная Конструкции.docx
icon Пояснительная ТОСП.docx

Additional information

Contents

1. Input for Development

architectural and construction section

2. Master Plan

3. Wind Rose

4. Brief description of the functional process

5. Space-planning characteristics of the building

6. Structural characteristics of building elements

7. Heat Engineering Calculation of Enclosing Structure (Roof Panel)

8. Heat Engineering Calculation of Enclosing Structure (Wall Panel)

9. Calculation of ground freezing depth and foundation bottom depth

10. Exterior and interior decoration of the building

11. Engineering equipment

12. Application

12.1. Floor Explication

List of used literature

1. Input for Development

architectural and construction section

The diploma project "Sports Center" was developed on the basis of the passport of the standard project No. 292816.87.

Construction area - Uglich

Climatic area: - IIB

Soils according to the study - loam

Outside air temperature is determined ([2] Table 1)

thol. day = 340С; t5khol. days = 31 0С

Groundwater level - 4.8 m from the surface of the earth.

The nature of groundwater is not aggressive.

The plot allotted for development has a calm relief and is free from demolition.

Building class - II

Degree of fire resistance - II

Durability - II

The building is equipped with all types of engineering equipment

Internal air mode normal tvn = + 180С

2. Master Plan

SNiP 2.07.01 - 89 * used when designing the master plan

"Urban planning. Planning and development of urban and rural settlements. "

The building area has a rectangular configuration, with plan dimensions of 75.0080.00m.

The terrain is calm.

The designed building is located in the central part of the site.

Horizontal snap to red line. Vertical binding is made to fiducial, in accordance with conventionally accepted contours.

Relative elevation ± 0.000 (ground floor elevation 1 floor) corresponds to absolute elevation 90.50.

The layout elevation near the building is accepted as 0.150 m.

On the site, in addition to the designed building, there are: a sports paraphernalia store, a cafe, a recreation area, a parking lot, a mini-football field, a running track, a garbage collection area.

The building density is 18.3%.

The improvement is made in the form of asphalt driveways (3.5m wide) and sites.

Sidewalks and driveways are limited by curb stone (30 × 15 cm). Around the building there is a pavement 0.5 m wide with a slope of 3% from the building.

Landscaping is made in the form of a lawn sown with perennial grasses, a flower garden, a shrub of ordinary planting, deciduous trees of ordinary and group planting, coniferous trees of group planting, with a total area of ​ ​ 3164.96 m2

The greening coefficient is 0.53.

The distance between the structures corresponds to fire and sanitary standards.

To divert stormwater, the section is inclined in the southeast direction.

The building is oriented according to the "Rose of the Winds" at an angle of 45 ° to the prevailing winter winds (used [2]).

2. Brief description of the functional process

The Zvezdny Sports Center is located in Uglich, designed in accordance with the general concept of the city, which provides for a harmonious combination of modern urban development and the natural environment. In the open air in winter there will be a "transformation" of a football field with a natural lawn into a hockey box - all this provides wide opportunities for various sports competitions and holidays.

Living greenery and snow cover, growing trees, interesting entertainment programs and the beauty of walking - all this will undoubtedly give a vivid impression to visitors to Zvezdny. This sports complex is the main sports facility of the city used for game sports.

For this, the building has a sports hall with a power training area, a coach room, an inventory room, as well as massage rooms and a dry heat chamber. For convenience, there are separate bathrooms for men and women, showers. There is also an administrator's room, dressing rooms and, to ensure the health of visitors, a consultation medical center.

The normal mode will be natural lighting through the glazed wall on the south side, in combination with ceiling lamps on the north side. During sports matches, it is possible to block the light opening and use artificial lighting.

The Zvezdny Sports Center is a modern sports facility. All necessary conditions for physical education and sports are created here.

1. Exterior and interior decoration of the building

External decoration - wall panels from ground level to elevation + 1.200 are blue. Above this level - factory panels have a white color.

Interior decoration - Hay and partitions in the building are made and lined according to the "Tigi Knauf" system, followed by painting with water compositions of paints. Partitions in bathrooms are made of moisture-resistant gypsum fiber sheets (HLV). The walls in the cafe are glued with wallpaper, starting from a height of 1 m from the floor. The lower part of the wall is painted with an aqueous composition of paints. Floors in utility rooms, in undress rooms, bathrooms, showers, wardrobes are made of ceramic tiles 150x150. In the trainer's room, massage rooms, consultation center, administrator's room, engineering unit, the floors are made of linoleum. Doors are painted white with enamel paint with the addition of color. During the finishing process, the columns are closed with gypsum board sheets, or plastic skin.

2. Engineering equipment

Water supply - domestic drinking water from external sources .

Head at input: H = 20.0 m.

Sewerage - household in the external network.

Heating - centralized, water from external sources.. Coolant parameters Tn = 95700C.

Ventilation is influential with a mechanical motive and natural.

Power supply - from city networks with voltage of 380/220 V

Lighting - fluorescent, filament lamps

Communication devices - telephony, Internet, computerization, radioactivity from urban networks; fire alarm - from stationary system.

Drawings content

Free downloading for today

Update after: 3 hours 56 minutes
up Up