• RU
  • icon Waiting For Moderation: 8
Menu

DEVELOPMENT OF THE PROJECT OF THE UPHOLSTERY SECTION WITH A DISASSEMBLY AND INSTALLATION POST FOR A SERVICE STATION OF CARS

  • Added: 22.12.2023
  • Size: 2 MB
  • Downloads: 0
Find out how to download this material

Description

To work out the project of the upholstery section with a disassembly and assembly post for a hundred cars, it is necessary to take into account several key aspects. The process may include the following steps:

Analysis of initial data:

  • Determination of the total area of the plot.
  • Development of technical requirements for upholstery materials.
  • Determination of the throughput capacity of the site and its maximum load.

Layout design:

  • Development of the optimal layout of the site, taking into account the distribution of working areas.
  • Placement of workplaces and equipment for car upholstery.
  • Taking into account safety standards and ergonomics of work.

Equipment selection:

  • Selection and installation of equipment for disassembling and assembling upholstery elements.
  • Development of technical requirements for equipment (slipways, upholstery tables, tools).

Security:

  • Development of a fire safety scheme.
  • Installation of ventilation and air conditioning system.
  • Design of power supply and lighting systems.

Process development:

  • Determination of the sequence of operations for the upholstery of cars.
  • Development of quality standards for upholstery works.
  • Training of personnel in new technologies and methods of work.

Waste Management:

  • Development of a waste management system (old upholstery, material trimmings).
  • Compliance with environmental standards in waste disposal.

Organization of process management:

  • Development of a personnel management system at the site.
  • Implementation of a production performance accounting system.

Testing and commissioning:

  • Carrying out upholstery tests to check efficiency and quality.
  • Adjustment of equipment and processes.

Staff training:

  • Conducting training of employees on new technologies and safety standards.
  • Organization of trainings and briefings.

Launching and maintaining:

  • Launch of production at the site.
  • Carrying out regular maintenance of the equipment.

When developing a project, it is necessary to collaborate with professionals in the field of automotive upholstery, safety engineers, as well as taking into account local building and environmental standards.

Project's Content

icon Coala 2.pdf
icon Planul tehnologic.dwg
icon Coala 1.pdf

Free downloading for today

Update after: 3 hours 42 minutes
up Up