DEVELOPMENT OF THE PROJECT OF THE UPHOLSTERY SECTION WITH A DISASSEMBLY AND INSTALLATION POST FOR A SERVICE STATION OF CARS
- Added: 22.12.2023
- Size: 2 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
To work out the project of the upholstery section with a disassembly and assembly post for a hundred cars, it is necessary to take into account several key aspects. The process may include the following steps:
Analysis of initial data:
- Determination of the total area of the plot.
- Development of technical requirements for upholstery materials.
- Determination of the throughput capacity of the site and its maximum load.
Layout design:
- Development of the optimal layout of the site, taking into account the distribution of working areas.
- Placement of workplaces and equipment for car upholstery.
- Taking into account safety standards and ergonomics of work.
Equipment selection:
- Selection and installation of equipment for disassembling and assembling upholstery elements.
- Development of technical requirements for equipment (slipways, upholstery tables, tools).
Security:
- Development of a fire safety scheme.
- Installation of ventilation and air conditioning system.
- Design of power supply and lighting systems.
Process development:
- Determination of the sequence of operations for the upholstery of cars.
- Development of quality standards for upholstery works.
- Training of personnel in new technologies and methods of work.
Waste Management:
- Development of a waste management system (old upholstery, material trimmings).
- Compliance with environmental standards in waste disposal.
Organization of process management:
- Development of a personnel management system at the site.
- Implementation of a production performance accounting system.
Testing and commissioning:
- Carrying out upholstery tests to check efficiency and quality.
- Adjustment of equipment and processes.
Staff training:
- Conducting training of employees on new technologies and safety standards.
- Organization of trainings and briefings.
Launching and maintaining:
- Launch of production at the site.
- Carrying out regular maintenance of the equipment.
When developing a project, it is necessary to collaborate with professionals in the field of automotive upholstery, safety engineers, as well as taking into account local building and environmental standards.
Project's Content
Coala 2.pdf
|
Planul tehnologic.dwg
|
Coala 1.pdf
|
Similar materials
- 25.01.2023
- 10.06.2022
- 17.05.2023
- 11.09.2022
Free downloading for today
Update after: 3 hours 33 minutes
- 20.08.2014