Development of design and estimate documentation for the reconstruction of the facility unfinished for physical education and recreation complex for game sports in Murmansk - General site works. Heat networks
- Added: 01.07.2014
- Size: 7 MB
- Downloads: 2
Description
Project's Content
|
|
Лист 1.dwg
|
Лист 10.dwg
|
Лист 2.dwg
|
Лист 3.dwg
|
Лист 4.dwg
|
Лист 5.dwg
|
Лист 6.dwg
|
Лист 7.dwg
|
Лист 8.dwg
|
Лист 9.dwg
|
Пояснительная записка.doc
|
Спецификация. Лист 1-5.doc
|
Additional information
Contents
1. EXPLANATORY NOTE
1.1 Initial data
1.2 Heat Loads
1.3 Heat Supply Source
1.4 Coolant parameters
1.5 Heat Networks
1.5 Heat Networks
In accordance with the accepted heat source heat supply system
water, closed, double-tube is provided.
The circuit of the thermal network is adopted dead end.
The project takes into account the transfer of the Du600 mm main pipeline. taking into account
requirements of item 9.7 of SNiP 41032003. Transportable Trunk Section
pipeline is laid in reinforced concrete semi-passageways
Du600 mm pipes are used for laying. in polyurethane foam
insulation as per GOST 307322006. At the tie-in point of the transportable trunk
a heat chamber is installed in the existing heating network. In thermal
Du80 mm projected pipeline is designed for the chamber. crashes into the portable
Du600 mm main pipeline. From the camera to the physical education building
heat network is laid in impassable
reinforced concrete channels. Du80 mm pipes are used for laying. in
polyurethane foam insulation according to GOST 307322006.
For compensation of thermal deformations of pipelines of heat networks
self-compensation is used.
Pipelines are installed on welding. Piping installation in
insulation from polyurethane foam shall be made specialized
installation organization. Sealing of welded joints of pipes with SGP-insulation
made using a shell of polyurethane foam and roll
heat shrinkable materials.
At the outlet of the heat chamber and at the entrance to the building insert
not less than 3 meters long from non-combustible materials (cylinders of heat insulation
mineral wool on synthetic binder as per TU 5762-
010-45757203-01, 40 mm thick produced by Mineralnaya Wata CJSC).
Лист 1.dwg
Лист 10.dwg
Лист 2.dwg
Лист 3.dwg
Лист 4.dwg
Лист 5.dwg
Лист 6.dwg
Лист 7.dwg
Лист 8.dwg
Лист 9.dwg
Similar materials
- 04.11.2022
- 01.07.2014
- 09.07.2014
- 03.07.2014
- 07.04.2024
- 20.05.2019
- 01.07.2014