• RU
  • icon Waiting For Moderation: 20
Menu

Design of the machine shop section for machining the shaft-gear part

  • Added: 02.06.2022
  • Size: 2 MB
  • Downloads: 2
Find out how to download this material

Description

CONTENT.

INTRODUCTION

1. GENERAL SECTION.

  1. Description of the design. The official purpose of the part.   
  2. Technological control of the drawing of the part and analysis 

details for manufacturability.                                             

  1. TECHNOLOGICAL SECTION.
    1. Characteristics of a given type of production.                 
    2. Selection of the type and justification of the method of obtaining the workpiece.         
    3. Selection of general allowances and tolerances for machining. Calculation of the mass of the workpiece and the coefficient of material use.   
    4. Selection and substantiation of technological bases.                       
    5. Development of a route plan for processing the part with the choice of equipment and machine tools. Justification of the adopted route plan and characteristics of the equipment.                     
    6. Element-by-element process of part processing.                 
    7. Determination of operating allowances and sizes:             

2.7.1. Calculation of interoperative allowances and dimensions on the surface  by analytical method.

2.7.2. Appointment of allowances for processing in a tabular manner.

  1. Selection of cutting auxiliary and measuring tools for process operations.                       
  2. Selection of rational cutting modes and determination of time norms for machining operations.                                   
  3. DESIGN SECTION.

3.1 Description of the device and the principle of operation of the machine tool for the operation 

3.2 Calculation and construction of the                         device

3.3 Calculation and design of the worm modular cutter for the operation                                                                    

3.4.Organization of technical control at the site. Calculation of actuating dimensions of  the gauge bracket for dimensional                                                           control

  1. ORGANIZATIONAL SECTION.

4.1. Determination of the required amount of equipment, its loading   

4.2 Calculation and organization of multi-machine maintenance at the site. Composition and calculation of the number of participants in production, taking into account multi-machine maintenance.                                         

4.3 Layout of equipment and calculation of required production areas                                                                 

4.4 Transportation of the part on site                           

4.5 Organization of equipment repair at the                 site

4.6 Ensuring normal working conditions and safety at the site.

4.6.1 Calculation of ventilation and lighting on the               site   

4.6.2 Electrical and fire safety             

4.7  Environmental                                     protection

4.8 Disposal of production waste from the site                   

  1. ECONOMIC SECTION.
    1. Calculation of the cost of fixed working capital of the site   
    2. Determination of the payroll fund for employees         
    3. Calculation of general and general production expenses 
    4. Determination of the cost of the part, calculation and cost estimate.                                                             

5.5 Business Summary           Statement

  1. CONCLUSION

6.1. Feasibility study of business efficiency of the project.                                                               

Bibliography                                          

Project's Content

icon
icon
icon DP_Baev_Ekonomika.docx
icon График загрузки, план участка.frw
icon деталь, и загатока.frw
icon
icon записка.doc
icon
icon
icon деталь, и загатока.frw
icon
icon карты наладок.frw
icon РТК.frw
icon
icon приспособление зубофасочное.frw
icon
icon калибр скоба 05.cdw
icon Фреза червячная м=4,5.cdw
icon
icon График загрузки, план участка.frw
icon калибр скоба 05.cdw
icon карты наладок.frw
icon контрольное.frw
icon приспособление зубофасочное.frw
icon РТК.frw
icon спецефик для контрольного.doc
icon
icon Ведомость ДП.spw
icon График загрузки, план участка.doc
icon спецефик для приспособление зубофасочное.doc
icon
icon допуски на пробки.frw
icon карта эскизов 040.frw
icon карта эскизов 045.frw
icon карта эскизов 065.frw
icon карта эскизов005.frw
icon Операционная 005.doc
icon Операционная 040.doc
icon Операционная 045.doc
icon Операционная 065.doc
icon тех.процесс.doc
icon техконтколь125.doc
icon Титульник.doc
icon эскиз контроля 2лист .frw
icon эскиз контроля.frw
icon
icon 2.frw
icon Фрагмент п.3,2.frw
icon Фрагмент.frw
icon Фреза, карты наладок.frw

Additional information

Drawings content

icon График загрузки, план участка.frw

График загрузки, план участка.frw

icon деталь, и загатока.frw

деталь, и загатока.frw

icon деталь, и загатока.frw

деталь, и загатока.frw

icon карты наладок.frw

карты наладок.frw

icon РТК.frw

РТК.frw

icon приспособление зубофасочное.frw

приспособление зубофасочное.frw

icon калибр скоба 05.cdw

калибр скоба 05.cdw

icon Фреза червячная м=4,5.cdw

Фреза червячная м=4,5.cdw

icon График загрузки, план участка.frw

График загрузки, план участка.frw

icon калибр скоба 05.cdw

калибр скоба 05.cdw

icon карты наладок.frw

карты наладок.frw

icon контрольное.frw

контрольное.frw

icon приспособление зубофасочное.frw

приспособление зубофасочное.frw

icon РТК.frw

РТК.frw

icon Ведомость ДП.spw

Ведомость ДП.spw

icon допуски на пробки.frw

допуски на пробки.frw

icon карта эскизов 040.frw

карта эскизов 040.frw

icon карта эскизов 045.frw

карта эскизов 045.frw

icon карта эскизов 065.frw

карта эскизов 065.frw

icon карта эскизов005.frw

карта эскизов005.frw

icon эскиз контроля 2лист .frw

эскиз контроля 2лист .frw

icon эскиз контроля.frw

эскиз контроля.frw

icon 2.frw

2.frw

icon Фрагмент п.3,2.frw

Фрагмент п.3,2.frw

icon Фрагмент.frw

Фрагмент.frw

icon Фреза, карты наладок.frw

Фреза, карты наладок.frw

Free downloading for today

Update after: 18 hours 50 minutes
up Up