• RU
  • icon Waiting For Moderation: 0
Menu

Design of excavation technology

  • Added: 09.07.2014
  • Size: 353 KB
  • Downloads: 1
Find out how to download this material

Description

Course draft explanatory note, drawing

Project's Content

icon
icon Курсовик.doc
icon Чертеж.dwg

Additional information

Contents

1. Input, Option No.

2. Calculation of earthworks in vertical planning

3. Calculation of excavation volumes during pit development

3.1. Sizing Pits Below

3.2. Determining Slope Location

3.3. Dimensions of the pit on the surface

3.4. Pit volume

3.5. Calculation of the volume of the entry trench

3.6. Backfill volume

3.7. Determination of the amount of soil damage and the amount of damage

4. Selection of the method of work execution during site planning:

5. Selection of pit development machines

5.1. Selection of excavator with reverse shovel equipment

5.2. Selection and calculation of the number of vehicles for the transport of soil developed in the pit

6. Organization and procedure of works execution

6.1. Site Planning Organization and Technology

6.2. Design of excavator penetrations

7. Work Schedule

8. Technical and economic indicators

9. Safety precautions

10. List of used literature

Drawings content

icon Чертеж.dwg

Чертеж.dwg
up Up