• RU
  • icon Waiting For Moderation: 23
Menu

Coursework - Project of organization of construction of a sports pavilion in the city of Azov

  • Added: 10.11.2022
  • Size: 952 KB
  • Downloads: 0
Find out how to download this material

Description

Initial data for the course project:
Floor plan, space-planning indicators, the place of construction of the Sports Pavilion. 
The dimensions of the building are 28.5 × 72.4 m; Н=9,2 m; Q=5 t; 
Built-up area – 1520 m2; 
Total area of the building – 2063m2; 
Construction volume of the building - 5950m3; 
Annual output per worker = 2000 thousand rubles / person year. 

Technical and economic indicators for the project
Building coefficient:
K zest = 0,43
Area utilization factor: 
K iso = 0,65
Construction time: a) Standardized – 1 year
                                      b) Planned – T_plan=T_norms/α=1/1.1=0.9
Length of temporary engineering networks:
overhead electric lines – 400.8 m;
power electrical cables – 201.4 m;
water pipe – 1965 m;
sewerage – 113,5 m
6. Estimated construction cost 82520
7.Area of temporary roads – 1161,7 m2

Project's Content

icon ОС А1.dwg
icon Титульник, Задание, ПЗ, Литература.docx

Additional information

Drawings content

icon ОС А1.dwg

ОС А1.dwg

Free downloading for today

Update after: 10 hours 58 minutes
up Up