Course project on the basics of construction production with an explanatory note. Construction schedule of a high-rise building with a retail facility
- Added: 01.02.2024
- Size: 4 MB
- Downloads: 2
Description
A complete course project on architecture, including the flow of assembly cranes, calculation of labor costs, down to the number of mounting bolts. All related drawings are present
Project's Content
|
|
|
|
The material is an archive with files that can be opened in programs:
- Microsoft Word
- AutoCAD or DWG TrueView
Similar materials
- 29.05.2015
- 03.07.2014
- 24.03.2021
Free downloading for today
Update after: 2 hours 24 minutes
- 25.01.2024