• RU
  • icon Waiting For Moderation: 0
Menu

Construction of AGDS with gas pipeline branches and supply gas pipelines at CHPP-2

  • Added: 17.08.2023
  • Size: 26 MB
  • Downloads: 0
Find out how to download this material

Description

Detailed design  "Construction of AGDS with gas pipelines branches and supply gas pipelines at CHPP-2".

The project has developed technological solutions for an automated gas distribution station (AGDS) for gas supply to CHPP-2. At the AGDS site, measures are provided for the purification of incoming gas from mechanical impurities, commercial gas metering, gas heating, reduction of gas pressure from 5.4 MPa to 1.2 MPa.

Project's Content

icon
icon АГРС ТЭЦ 2 ТХ.dwg

Free downloading for today

Update after: 2 hours 47 minutes
up Up