Construction of AGDS with gas pipeline branches and supply gas pipelines at CHPP-2
- Added: 17.08.2023
- Size: 26 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
Detailed design "Construction of AGDS with gas pipelines branches and supply gas pipelines at CHPP-2".
The project has developed technological solutions for an automated gas distribution station (AGDS) for gas supply to CHPP-2. At the AGDS site, measures are provided for the purification of incoming gas from mechanical impurities, commercial gas metering, gas heating, reduction of gas pressure from 5.4 MPa to 1.2 MPa.
Project's Content
|
АГРС ТЭЦ 2 ТХ.dwg
|
Similar materials
- 31.05.2023
- 09.08.2014
- 09.08.2014
- 29.07.2014
Free downloading for today
Update after: 4 hours 31 minutes
- 06.06.2020
Other materials
- 24.04.2014