• RU
  • icon Waiting For Moderation: 18
Menu

Club house at: der. Kurovo, Ilyinsky s/o, Dmitrovsky district, Moscow region - VK, OV

  • Added: 29.07.2014
  • Size: 3 MB
  • Downloads: 0
Find out how to download this material

Description

Golf Club. Sections II, IC

Project's Content

icon
icon
icon
icon
icon
icon
icon В1,В2,Т3,Т4.dwg
icon К1,К3.dwg
icon ВК.ПЗ.Гольфклуб.doc
icon
icon В1,В2,Т3,Т4.cdw
icon К1,К3.cdw
icon Спецификация.xls
icon
icon ЗАПИСКА ОВ 1-й лист.doc
icon ЗАПИСКА ОВ посл.doc
icon
icon Вентиляция 1-й этаж (1).cdw
icon Вентиляция 2-й этаж (1).cdw
icon Вентиляция 3-й этаж (1).cdw
icon Вентиляция цокольный этаж (1).cdw
icon Обвязка приточной установки (1).cdw
icon Общие данные (1).cdw
icon Отопление 1-й этаж (1).cdw
icon Отопление 2-й этаж (1).cdw
icon Отопление 3-й этаж (1).cdw
icon Отопление цокольный этаж (1).cdw
icon Схема В1 (1).cdw
icon Схема П1 (1).cdw
icon Схемы (1).cdw
icon ОВ Спецификация.xls

Additional information

Contents

General provisions

Heating

Ventilation

Heat supply of supply unit heater

Fire fighting measures

Noise regulatory measures and

vibrations

Automation, control and control of parameters

Energy Efficiency Activities

Heating and ventilation

1. General provisions

Design of engineering equipment of the club house building located at the address: Mosk. regional, Dmitrovsky rn, Ilyinsky s/o, Kurovo village - heating and ventilation systems are carried out on the basis of the adopted architectural and planning decisions and in accordance with the requirements of the current Russian norms, rules and standards:

-SNiP 2.04.0591 * - "Heating, ventilation and air conditioning"

-SNiP 230199 - "Construction climatology"

- SNiP II379 * - "Construction heat engineering"

-SNiP 2.010285 - "Fire Safety Standards"

-SNiP 2.08.0289 * - "Public buildings and structures"

-SNiP 210197 - "Fire safety of buildings and structures"

The designed building is 3 storeys, with a basement. The equipment of the building with the proposed engineering systems provides the necessary and up-to-static comfort of the microclimate of the premises at the level of modern requirements, including reliability and operational efficiency.

All systems are equipped with automatic control and control means.

4. Heat supply of supply unit heater.

Heat supply of a heater of incoming installation from the boiler house, according to the dependent scheme with parameters of heat carrier 9570 wasps .

Pipelines shall be made of steel electric welded pipes as per GOST 1070491 and shall be laid in the floor structure. Insulate with heat insulation tubes "HT Armaflex" with wall thickness of 13mm.

All pipelines are equipped with the necessary control, disconnection and drain valves.

Install the heat supply system as per SNiP 3.05.0185.

5. Fire fighting measures

All technical solutions regarding explosion and fire safety for ventilation are made in accordance with the requirements of SNiP 2.04.0591 * "Heating, ventilation and air conditioning" and PUE (electrical installation rules).

In the plenum and exhaust ventilation system, straight-coal fire-retarding valves of the FFL with a thermal lock and a fire resistance limit of 1 hour are installed.

Centralized automatic shutdown of ventilation systems in case of fire is provided.

6. Noise and vibration regulation measures

In order to reduce noise and vibration occurring during operation of ventilation equipment, the following measures are provided:

- connection of ventilation equipment and air ducts to each other is performed by means of flexible inserts;

- premises of ventilation chambers are recommended to be isolated with noise-absorbing material;

- plenum and exhaust plants are equipped with silencers;

- channel fans are made in noise-proof version.

7. Automation, management and control of parameters

The automation diagram of the plenum plant provides for:

1. Automatic maintenance of supply air temperature;

2. Calorifer protection against freezing by air temperature downstream calorifer and by temperature of return coolant;

3. Interlocked control of the air damper with the operation of the supply fan;

4. Emergency stop of the fan at actuation of calorifer protection against freezing;

5. Alarm of filter clogging;

6. Emergency stop of the fan when the dif relay operates. pressure at absence of air head;

7. Emergency stop of fans in case of fire alarm.

8. Energy efficiency activities.

The project uses the following energy efficiency measures:

1. Total heat and water consumption in heating and ventilation systems is taken into account at the corresponding metering units in the boiler room.

2. Control valves "Danfos" are installed in the heating system, and control valve valves are installed on heating devices.

3. In the heat supply system of the plenum plant heater, a control 3-way valve is used, which adjusts the steam meters of the coolant depending on the temperature of the outside air.

4. Heat curtains operate on air recirculation.

Drawings content

icon В1,В2,Т3,Т4.dwg

В1,В2,Т3,Т4.dwg

icon К1,К3.dwg

К1,К3.dwg

icon В1,В2,Т3,Т4.cdw

В1,В2,Т3,Т4.cdw

icon К1,К3.cdw

К1,К3.cdw

icon Вентиляция 1-й этаж (1).cdw

Вентиляция 1-й этаж (1).cdw

icon Вентиляция 2-й этаж (1).cdw

Вентиляция 2-й этаж (1).cdw

icon Вентиляция 3-й этаж (1).cdw

Вентиляция 3-й этаж (1).cdw

icon Вентиляция цокольный этаж (1).cdw

Вентиляция цокольный этаж (1).cdw

icon Обвязка приточной установки (1).cdw

Обвязка приточной установки (1).cdw

icon Общие данные (1).cdw

Общие данные (1).cdw

icon Отопление 1-й этаж (1).cdw

Отопление 1-й этаж (1).cdw

icon Отопление 2-й этаж (1).cdw

Отопление 2-й этаж (1).cdw

icon Отопление 3-й этаж (1).cdw

Отопление 3-й этаж (1).cdw

icon Отопление цокольный этаж (1).cdw

Отопление цокольный этаж (1).cdw

icon Схема В1 (1).cdw

Схема В1 (1).cdw

icon Схема П1 (1).cdw

Схема П1 (1).cdw

icon Схемы (1).cdw

Схемы (1).cdw
up Up