Design of CCU building

Project's Content

icon
icon эскизный проект.bak
icon Пояснительная записка.doc
icon эскизный проект.dwg
icon priorbank001.jpg
icon priorbank002.jpg
icon priorbank003.jpg

Additional information

Common part.

Project "Building of CBU (Banking Services Center)" Priorbank "OJSC

from fast-moving structures in Svetlogorsk microdistrict

Oktyabrsky, 63

- PIR Agreement N 19/0808 dated August 19, 2008;

- decisions of Svetlogorsk district executive committee

No. 1359 of 26.09.07;

-architecture and planning task No. 321 dated 18.02.2008;

- assignment for design of the client of Priorbank OJSC;

-plan assignment from ........

-technical conditions of interested organizations.

Boundaries of the designed area shall be accepted according to the Act of location selection

location of the land plot (decision of the Svetlogorsk Executive Committee

No. 1359 dated 26.09.2007).

Land plot designed to house the Center

banking services located in the Oktyabrsky microdistrict in

central part of Svetlogorsk.

The Banking Services Centre is designed to provide appropriate services

the population of the Oktyabrsky microdistrict and residents of the city of Svetlogorsk.

The functional capacity of the facility is provided by 17 employees

according to the staffing table approved................ Priorbank.

For CCU engineering, according to calculations made

specialist.................... necessary need:

-in thermal energy is...................

-in electric power is.............

-in drinking water supply is.................

Main technical and economic indicators

Liability Class II.

Degree of fire resistance VIII.

Functional fire hazard class F3.5.

Stl = 262.91m ².

Useful = 255.15 m ².

Snormir = 212.13 m ².

Szaster = 335.66m ².

Vstr = 2266.65m ³.

Construction of the designed facility is carried out in one

the queue. For people with limited mobility, the project

a set of measures according to the existing TNAP is provided.

The design of the CCU is developed taking into account the requirements of the current

regulatory and technical framework.

Master Plan

The projected site is located at the intersection of the street. Sverdlova

and st. Them. 50th anniversary of October in the central part of Svetlogorsk on

territory of the Oktyabrsky microdistrict. The relief of the site is calm

with a slight slope in the westerly direction. Height drop

ranges from 0.6 to 1.0 m. The land plot is free

from development. There are no buildings and structures to be demolished.

Coniferous trees grow on the designed site.

Quantity and quality indicators see Green Taxation Plan

plantations. Site for CCU location from the south is limited

st..............., -from the west st................, from the north adjoins

to the land plot of the store................, from the east - to the development

9-storey residential buildings.

Cover designed driveways and car parks accept from cast

asphalt concrete, paving of sidewalks - from concrete fine-sized

tiles. Transverse profile of driveways and platforms adopted by the city

type with installation of curb made of concrete side stone on

base of skinny concrete mixture.

The proposed vertical layout scheme allows you to withdraw

surface water along lawns and sidewalks further along the sides

roads to the rain wells of the city storm sewage system.

Vertical layout design completed with maximum preservation

existing elevations. Design slopes of territory, driveways

and footpaths fluctuate within regulatory limits.

Plot Plan draft completed on topographic basis

scale 1:500, performed............. ODO "Bials" in August 2008.

To ensure traffic safety, it is provided

parking on the street. 50th anniversary of October.

Capacity corresponds to standard (see calculation), designed

rational pedestrian links.

The draft master plan has been implemented taking into account the requirements of the norms

fire safety. Driveways and planting of green spaces

designed with the condition of ensuring unhindered

access special. equipment for the object.

Removal is required prior to commencement of civil works

fertile layer and ensure storage on the withdrawn

territory with subsequent use for improvement needs

and landscaping.

Landscaping and landscaping of the designed area includes

planting lawns from the recommended grass mixture, planting decorative shrubs and trees, installing torsch lamps

on pedestrian communications, arrangement of flower beds (taking into account

seasonality of flowering), illumination of the object in the evening, advertising

lighting.

Along with the above, it is supposed to install small architectural forms (benches, urns, flower beds).

Technical and economic indicators

To ensure free access for persons with disabilities

physical capabilities to the project of the general plan to be designed by the CCU

provides for compliance with regulatory slopes for pedestrian

directions, laying of lowered side at intersections with

transport passes, compliance with standard dimensions.

The draft general plan was developed in accordance with the requirements of the existing TNAP.

Attach and route utility networks to the appropriate

urban communications performed according to TU of stakeholders

organizations and based on regulatory requirements (see summary

Utility Plan).

Architectural and construction solutions

Geology....................

Design of the building of the Central Bank (Banking Services Center) in Svetlogorsk

made on the basis of the Architectural and Planning Task,

Client's design and planning tasks.

CCU building three-volume, one-story with plan dimensions

16.23kh19.92m. Volumetric-spatial solution of CCU built

on the principle of a central-axial composition with a dominant

middle part. The designed building has the following structural

diagram:

- columnar foundations made of monolithic reinforced concrete ;

- metal rolling frame;

- enclosing structures of "sandwich" type (metal

panels with insulation);

- prefabricated partitions.

Finishing of facades with metal cassettes (decorative coating

executed in factory conditions).

Windows, stained glass windows, and exterior doors - double-chamber double-glazed windows

in metal bindings.

Basement finish and sawn granite wing.

To provide free access to the object for persons with

Limited physical capabilities include:

- ramp arrangement at the main entrance;

- compliance with standard distances and dimensions;

-observation of normative grades and permissible values in places

elevation difference (thresholds).

To create comfortable conditions for visitors and employees

CCU makes maximum use of natural lighting of rooms with

the constant stay of people.

Finishing of rooms (ceilings, floors, wall surfaces) according to

requirements of TKP 453.02-55-2006 "Bank Buildings."

A bathroom is provided for domestic service of workers

and a staff room housing the street and home wardrobe

clothing and a place to eat.

The project ensures compliance with fire safety standards:

- the building has two evacuation exits;

- standard distances from workplaces to

evacuation exits;

-the width of escape routes meets the requirements of the norms;

-the width and direction of door opening meets the requirements

norms;

- separation of floors, walls and ceilings on escape routes - according to

TNAP requirements.

Protection of building structures against corrosion is provided

in construction project drawings according to requirements

SNiP 2.03.1185 "Protection of building structures against corrosion."

Drawings content