Building of CBU (Banking Services Center) Priorbank OJSC from fast-moving structures -AR
- Added: 30.08.2014
- Size: 2 MB
- Downloads: 1
Description
Project's Content
|
эскизный проект.bak
|
Пояснительная записка.doc
|
эскизный проект.dwg
|
priorbank001.jpg
|
priorbank002.jpg
|
priorbank003.jpg
|
Additional information
Common part.
Project "Building of CBU (Banking Services Center)" Priorbank "OJSC
from fast-moving structures in Svetlogorsk microdistrict
Oktyabrsky, 63
- PIR Agreement N 19/0808 dated August 19, 2008;
- decisions of Svetlogorsk district executive committee
No. 1359 of 26.09.07;
-architecture and planning task No. 321 dated 18.02.2008;
- assignment for design of the client of Priorbank OJSC;
-plan assignment from ........
-technical conditions of interested organizations.
Boundaries of the designed area shall be accepted according to the Act of location selection
location of the land plot (decision of the Svetlogorsk Executive Committee
No. 1359 dated 26.09.2007).
Land plot designed to house the Center
banking services located in the Oktyabrsky microdistrict in
central part of Svetlogorsk.
The Banking Services Centre is designed to provide appropriate services
the population of the Oktyabrsky microdistrict and residents of the city of Svetlogorsk.
The functional capacity of the facility is provided by 17 employees
according to the staffing table approved................ Priorbank.
For CCU engineering, according to calculations made
specialist.................... necessary need:
-in thermal energy is...................
-in electric power is.............
-in drinking water supply is.................
Main technical and economic indicators
Liability Class II.
Degree of fire resistance VIII.
Functional fire hazard class F3.5.
Stl = 262.91m ².
Useful = 255.15 m ².
Snormir = 212.13 m ².
Szaster = 335.66m ².
Vstr = 2266.65m ³.
Construction of the designed facility is carried out in one
the queue. For people with limited mobility, the project
a set of measures according to the existing TNAP is provided.
The design of the CCU is developed taking into account the requirements of the current
regulatory and technical framework.
Master Plan
The projected site is located at the intersection of the street. Sverdlova
and st. Them. 50th anniversary of October in the central part of Svetlogorsk on
territory of the Oktyabrsky microdistrict. The relief of the site is calm
with a slight slope in the westerly direction. Height drop
ranges from 0.6 to 1.0 m. The land plot is free
from development. There are no buildings and structures to be demolished.
Coniferous trees grow on the designed site.
Quantity and quality indicators see Green Taxation Plan
plantations. Site for CCU location from the south is limited
st..............., -from the west st................, from the north adjoins
to the land plot of the store................, from the east - to the development
9-storey residential buildings.
Cover designed driveways and car parks accept from cast
asphalt concrete, paving of sidewalks - from concrete fine-sized
tiles. Transverse profile of driveways and platforms adopted by the city
type with installation of curb made of concrete side stone on
base of skinny concrete mixture.
The proposed vertical layout scheme allows you to withdraw
surface water along lawns and sidewalks further along the sides
roads to the rain wells of the city storm sewage system.
Vertical layout design completed with maximum preservation
existing elevations. Design slopes of territory, driveways
and footpaths fluctuate within regulatory limits.
Plot Plan draft completed on topographic basis
scale 1:500, performed............. ODO "Bials" in August 2008.
To ensure traffic safety, it is provided
parking on the street. 50th anniversary of October.
Capacity corresponds to standard (see calculation), designed
rational pedestrian links.
The draft master plan has been implemented taking into account the requirements of the norms
fire safety. Driveways and planting of green spaces
designed with the condition of ensuring unhindered
access special. equipment for the object.
Removal is required prior to commencement of civil works
fertile layer and ensure storage on the withdrawn
territory with subsequent use for improvement needs
and landscaping.
Landscaping and landscaping of the designed area includes
planting lawns from the recommended grass mixture, planting decorative shrubs and trees, installing torsch lamps
on pedestrian communications, arrangement of flower beds (taking into account
seasonality of flowering), illumination of the object in the evening, advertising
lighting.
Along with the above, it is supposed to install small architectural forms (benches, urns, flower beds).
Technical and economic indicators
To ensure free access for persons with disabilities
physical capabilities to the project of the general plan to be designed by the CCU
provides for compliance with regulatory slopes for pedestrian
directions, laying of lowered side at intersections with
transport passes, compliance with standard dimensions.
The draft general plan was developed in accordance with the requirements of the existing TNAP.
Attach and route utility networks to the appropriate
urban communications performed according to TU of stakeholders
organizations and based on regulatory requirements (see summary
Utility Plan).
Architectural and construction solutions
Geology....................
Design of the building of the Central Bank (Banking Services Center) in Svetlogorsk
made on the basis of the Architectural and Planning Task,
Client's design and planning tasks.
CCU building three-volume, one-story with plan dimensions
16.23kh19.92m. Volumetric-spatial solution of CCU built
on the principle of a central-axial composition with a dominant
middle part. The designed building has the following structural
diagram:
- columnar foundations made of monolithic reinforced concrete ;
- metal rolling frame;
- enclosing structures of "sandwich" type (metal
panels with insulation);
- prefabricated partitions.
Finishing of facades with metal cassettes (decorative coating
executed in factory conditions).
Windows, stained glass windows, and exterior doors - double-chamber double-glazed windows
in metal bindings.
Basement finish and sawn granite wing.
To provide free access to the object for persons with
Limited physical capabilities include:
- ramp arrangement at the main entrance;
- compliance with standard distances and dimensions;
-observation of normative grades and permissible values in places
elevation difference (thresholds).
To create comfortable conditions for visitors and employees
CCU makes maximum use of natural lighting of rooms with
the constant stay of people.
Finishing of rooms (ceilings, floors, wall surfaces) according to
requirements of TKP 453.02-55-2006 "Bank Buildings."
A bathroom is provided for domestic service of workers
and a staff room housing the street and home wardrobe
clothing and a place to eat.
The project ensures compliance with fire safety standards:
- the building has two evacuation exits;
- standard distances from workplaces to
evacuation exits;
-the width of escape routes meets the requirements of the norms;
-the width and direction of door opening meets the requirements
norms;
- separation of floors, walls and ceilings on escape routes - according to
TNAP requirements.
Protection of building structures against corrosion is provided
in construction project drawings according to requirements
SNiP 2.03.1185 "Protection of building structures against corrosion."
эскизный проект.dwg
Similar materials
- 13.04.2022
Free downloading for today
Other materials
- 09.07.2014