Building Building Reconstruction - Work Design, Dismantling

  • Added: 03.01.2021
  • Size: 2 MB
  • Downloads: 4
Find out how to download this material

Description

Work Execution Project (WDP) for disassembly of structures with preservation of historically valuable building elements

Project's Content

icon Генплан и ТК.bak.dwg
icon ПЗ_Ессентуки_москва_разборка.doc
icon График_Демонтаж корпуса 2.xls
icon ПЗ_Ессентуки_москва_разборкаР.doc

Additional information

Contents

Contents

Name of regulatory documents and information materials

General Information on the Work Site

3-

Organization of Work Site

Guidelines for Tree Sleeping Using Car Lifter

Instructions for Work

7-

Main period of building dismantling

Process of works execution during removal

Working Process Map QY25V523 (25t)

12-

Safe dismantling

Environmental protection

Fire fighting measures

Power supply

15-

Need for personnel and temporary buildings and facilities

Technical and economic indicators

Work Schedule

L.1 - AND

General plan

L.2 - AND

Diagram of AP-18 car lift operation on trees demolition

L.3 - AND

TK1- Clearing of construction area from trees

6 page A

TK2 - Removal of decor elements with the help of bus tower and stock scaffolding

1 sheet A

TK3 - Installation and disassembly of inventory scaffolding

1 sheet A

TK4 - - Manual disassembly of the building

14 page A

TK5 - Operation of wall-cutting machine HILTI

10 page A

TK6 - Phased destruction of structures using excavator

2 sheets A

General Information on the Work Site

Object: Reconstruction of building No. 2 of the Federal State Budgetary Institution "Sanatorium Moscow" at the address: Stavropol Territory, Essentuki, st. Anjievsky, house 8.

Gene Contractor: StroyTehIndustry-26 LLC

Certificate of admission to work that affects the safety of capital construction facilities. SROS03125082009 dated 25.08.2009

No. 1862.0520122632092715s031ot 29.02.2016 of g.

Yur. Address: 357500, Stavropol Territory, Pyatigorsk, ul. Admiralsky, 49.

TIN 2632092715, CAT 263201001,

Bank details (1): STAVROPOL BRANCH № 5230 SBERBANK PJSC STAVROPOL, p/s 40702810460090002328; Corr. Account 30101810907020000615 BIC 040702615.

Bank details (2): ASTRAKHAN BRANCH CB REB (JSC) G. ASTRAKHAN, Settl. Account 40702810000080309320; Corr. Account 30101810000000000788, BIC 041203788 .

Director of StroyTekhIndustriy26 LLC - Vitaly Zakharov.

The project is designed to perform work on disassembly and demolition of the existing building. The reason for the demolition is:

- Decision of the Customer of FSUE "Directorate for Construction and Reconstruction of Facilities of Federal State Bodies" of the Office of the President of the Russian Federation;

- Technical conclusion on the results of the survey of the technical condition of building structures and engineering systems of building No. 2 of the Federal State Budgetary Institution "Sanatorium" Moscow "of the Office of the President of the Russian Federation, at the address: Stavropol Territory, Essentuki, st. Anjievsky, house 8. Code: 0127/0212 _ Sanatorium Moscow - TZK;

- Act on the results of the state historical and cultural examination of scientific and design documentation (LLC ArchiMetrica of 17.02.2015).

Site climatic conditions:

Climatic area

111B

Design air temperature

- The 20th hail. With

Snow load 2nd district

84kg/sq.m

Wind load 4th district

73kg/sq.m

Seismicity

8 points

Depth of soil freezing

0.8 m

Soil characteristics

The concept of preserving the monument, taking into account its technical condition and requirements for operation, was proposed in a historical and cultural examination carried out by the certified expert V.V. Poletaykin. (000 "ArchiMetrics" O2.2015) Features of the building (partial preservation with the loss of a holistic historical composition, wear and mycological damage to the main part of the structures and decoration, features of the frame structure and different levels of architectural value of its elements) in combination with the requirements that the building in operation should meet, the 8-point seismic level of the region, the requirements for comfort and equipment of a modern medical and sanatorium institution, determined the approach to its preservation (repair, restoration, adaptation for modern use). With regard to the main parts of the building, the following activities were proposed:

Staircases.

Strengthening and restoration without dismantling. Reinforcement of structures, cleaning and restoration of external and internal stucco decor without dismantling. Organization of access to the preserved parts of the historical rubble foundation. Preserved cast iron stairs and their fences are cleaned from paint and corrosion layers, treated with anticorrosive compositions, primed and covered with enamel paint.

The rest of the building.

Dismantling of stone basements and external stairs, repair and installation in place. Dismantling of existing structures and facade decor. Arrangement of new structural structures. Repair of facade faceplate in dismantled condition with replacement of defective parts and subsequent installation on new structures. Reconstruction by iconography of lost historical details of wooden decor. Reproduction of historical coloring. Construction of a new rafter system, preserving the existing dimensions, slopes and elevation of the roof skate, a new roof covering of the same type as the historical one.

The project provides for the dismantling of part of the building with preservation and strengthening with further restoration of staircases and their fences, followed by the reconstruction of new foundations and structures of the building with the installation of a renovated (in a removed state) facade faceplate and wooden decor with full red brick filling of the faceplate panels.

Work Site Organization

The construction site shall be fenced to avoid access by unauthorized persons. The building site fencing is the existing fencing of the territory and the newly installed temporary fencing, according to the plan on sheet No. 1.

The fence design shall meet the requirements of GOST 2340778.

To protect the liquidated building and the territory of the construction site from the penetration of people and animals, it is necessary to:

install certain places for workers to go to the place of work;

at the entrance to the disassembly site, place an announcement on the prohibition of access to the territory of work of persons not related to the performance of work.

use shut-off systems;

Organize round-the-clock specialized security of the facility with a bypass of the area of ​ ​ work;

Install signs of driveways and passageways.

Green spaces in the 5-meter demolition zone are present in significant numbers, the project provides for the demolition of 17 trees.

Engineering and technical personnel certified for knowledge of the Safety Rules for Hazardous Production Facilities Using Lifting Facilities are allowed to perform work on the construction site on disassembly of buildings using lifting cranes. (hereinafter referred to as IR) having passed the test of knowledge of industrial safety requirements established in federal laws and other regulatory and legal acts of the Russian Federation.

For the period of work on disassembly of the building, the place of installation of the crane on the site is protected by a signal tape.

The entire construction site is enclosed by a continuous fence 2.0m high.

Disassembled structures and materials of decor and stucco with architectural and historical value, are stored on the storage site to bring them to the right state, take dimensions and perform inventory records, drawings

Construction debris is collected in special production containers, followed by export to the landfill of Argo LLC for disposal.

When organizing a site, placing areas of work, workplaces, driveways of construction machines, installing lifting mechanisms, it is necessary to indicate hazardous areas for people within which hazardous production factors constantly operate or potentially act.

The following zones should be considered as permanently operating hazardous production factors:

near non-insulated current-carrying parts of electrical installations;

close to non-fenced height differences by 1.3 m or more;

To perform work in a permanently operating hazardous area, a work permit must be issued.

Areas of potential operational hazards should include:

Sections of the territory near the construction facility;

Floors of buildings and structures in one grip, above which structures and equipment are dismantled;

Zone of movement of machines, equipment or their parts, working tools;

Places above which cargo is transported by lifting cranes.

Areas of permanently operating hazardous production factors in order to avoid access of unauthorized persons shall be protected by protective fences that meet the requirements of GOST 13407-78

Areas of potential operational hazards shall be protected by signal enclosures meeting the requirements of GOST 2340778. Hazardous areas shall be marked with safety signs and inscriptions in accordance with GOST 12.402678 SSBT.

The boundaries of hazardous areas within which hazards may arise due to falling objects are determined by the horizontal distance from the place where the cargo may fall. Hazardous area during crane operation - crane operation area plus 4.0m at lifting height up to 10m.

All persons located on the site where the buildings are demolished are required to wear protective helmets according to GOST 12.4.08780. Working and ITR without protective helmets and other personal protective equipment are not allowed to perform the work.

Safety signs should be installed at the gate of entry to the site: the entrance is prohibited, the crane works carefully, the traffic diagram of vehicles on the construction site.

Domestic premises of workers on disassembly are located in prefabricated premises of container type, installed behind hazardous area of cranes operation, in south-west corner of construction site.

Main period of building dismantling

Removal of housing No. 2 is performed in two flows and by grips:

The first stream is manual disassembly (removal) of decor elements, stucco, wooden elements of turrets, eaves, etc. Work is carried out from the cradle of a car lift, from scaffolding or a mobile installation tower. The remaining part of the building - staircases with cast iron stairs - is separated and protected. Disassembly of the structure of the gable roof and rafter system

Dismantling of demolished buildings begins with their examination for spontaneous collapse of structures: roofs, floors, walls.

After inspection - which is performed by the foreman and foreman, in rooms where there is no threat of collapse, dismantling (removal) of water supply, heating, radiators, etc.

The next step is to disassemble the roof and floor. Before starting dismantling, decorative elements are removed from the roof and facade, carefully placed in the places of storage of materials, for taking measurements and sketches for subsequent restoration of decorative elements.

Prior to completion of dismantling works - to establish the order of signals exchange between the person, the control disassembly, the car lift driver and the working disassembly operator. All commands are given by only one person, except for the "STOP" signal, which can be sent by any employee who has noticed a clear danger.

The car crane performs work on removing the roof structures from the disassembly zone to the storage site or to vehicles. (see PPRPS)

When carrying out dismantling operations, with a car crane and a car lift, work is allowed only under the guidance of the person responsible for the safe performance of work with lifting mechanisms. Operations are performed by grips. During the operation of the lift on one grip, work is carried out with the crane on another grip, with the obligatory observance of a distance of at least 5.0 m between the arrows and cargoes.

• The second stream - mechanized disassembly of the building, by the method of collapse of the frame structures. The works are performed by excavator - breaker, with hinged elements - bucket, hydraulic scissors, hydraulic hammer, wedge, etc.

Prior to the commencement of the mechanized demolition of the building using the HTACHI ZX 250 excavator, all preparatory work shall be performed:

· manually disassembled roof;

· manually dismantled decorative decoration of the facades and outbuildings of the building;

· the part of the building structures in the places of interface with the preserved stairways in axes "78" and "1516" is manually disassembled;

· protection of the preserved flights of stairs is performed;

· Install road slabs for excavator parking lots and temporary roads;

· arrangement of storage sites for inventory of dismantled elements of facade decor.

Protection of stair flights is performed by continuous wooden shields along the perimeter, to protect the stair structures from falling debris of building elements during further mechanized dismantling (breaking).

Mechanized demolition of a 2-story building is carried out from top to bottom to ground level from the "22" axis to the "1" axis, using an excavator - the HTACHI ZX 250 destroyer (or another with no less characteristics), with replaceable demolition equipment (ladle, reverse shovel, hydraulic hammer and hydraulic scissors). Demolition of the structure should begin on the side of axis "D," from axis "22." Demolition of the building is carried out in 12 ton grips. Demolition starts from axis "D." The excavator collapses the structures, moving to the opposite end of the building, to the wall along the axis "B," where it finishes the demolition of the building within the first grip. In the same way, the building is demolished on the grips "24," then the excavator turns towards part of the building in the axes "1310" and begins disassembly on the grips "57" according to the same scheme as on the grips "14." The excavator removes part of the building within the grip "8" from the grip "5." And then, according to the same scheme, the building is demolished within the "912" grips. The excavator should work particularly closely on the grips "34" and "910" near the stairwells to avoid damage to their structures .

After the collapse of structures, too large elements, depending on the material, are sawn or cut with autogenous devices. As the structures of the building are dismantled, the building waste should be immersed in dump trucks for removal to the landfill. The excavator should be installed at a distance of 5 meters from the projecting wall to the nearest caterpillar. The collapse of the building should be controlled, spontaneous collapse should be avoided, especially in the direction of the working excavator.

Excavation of the foundations of the dismantled building is carried out at the stage of erection of new structures of the reconstructed structure, simultaneously with the development of the pit soil, after the installation of a temporary tongue-and-tongue fence of the historical bud foundations of the preserved staircases.

Process of construction disassembly works on the site.

Need for personnel and material resources

Disassembly works are performed by a brigade consisting of:

Installer-stropiler 3 category - 2chel.

Gas welder - slingshot 3 discharge - 1chel.

Carpenter - stropaler 3 category - 4 people.

Operating on baffle pneumatic hammer (3) - 2chel.

Movers - slings of the 2nd category - 2 people.

If necessary - holding electrician - 1chel.

Only 12chel.

Mechanisms, equipment for disassembly of structures:

Automobile crane QY25V523 (25t) - 1 pc

The CO7A compressor - 1 piece

Baffle hammers 2 pcs

Welding generator (gas cutter) 1pc

Oxygen bottle with reduction gear - 2 pcs

Propane cylinder with reduction gearbox - 2 pcs

Disk Electronic Saws (Bolgarki) - 2 pcs.

Automatic dump trucks 8tn - 1pc

Manual talc g/t 3.0t - 1pcs

Installation ladders - 2 pcs

Hemp ropes - 50pm

Scrap steel - 2 pcs

Kirka - 2 pcs

Scoop shovels - 2 pcs.

Garbage containers - 4 pcs

Workers must perform disassembly work in protective helmets, special clothes, protective glasses, sleeves. When performing work with dust formation - respiratory devices. For operation at height - safety mounting belt is attached to safety steel rope D = 810mm.

If the design is not of value for reuse of materials, it falls on the floor using an excavator with a bucket or with a wedge. Flooring collapsed on the floor is sorted for disposal - wood and other combustible materials - for disposal at an incinerator, brick, stone, etc. incombustible garbage - to a landfill.

Overlaps where such destruction is not possible are disassembled manually using a crane. Wooden floor beams are released in the places of supports by a gas cutter or a Bulgarian, slung onto the crane hook and transferred to the storage place for further disposal.

At the facility there are stone concrete foundations - the basement part - the dismantling of which is carried out by bump hammers, the bottom from the ground. As stones are valuable, sawn stones are brought into good condition and stored for reuse. Stones that are not suitable for further use by an excavator are loaded onto car dump trucks and taken to landfill.

Thin dilapidated walls and partitions up to 3.0m high - are destroyed by overturning using an excavator and they are loaded for removal.

In buildings located along residential buildings on the eastern side, disassembly should be carried out to the level of concrete floors. Since this section will be located under the crane tracks. - Loosening the foundation is impractical.

In the places of adjoining to the preserved staircases, dismantle manually, separate the building structures from the staircases using diamond cutting.

Requirements to be observed when working with diamond cutting installations (tools):

- The specialist who has to carry out this operation must protect himself, using the means of individual protection: respiratory, thick gloves, headphones, boots with a fortified cape and special glasses.

Before starting any operation using such equipment, it is necessary to check whether it is functioning properly, evaluate its technical condition, carefully inspect the disk (first of all, if it corresponds to the tool used and the type of work performed). You should also check the spindle of the machine: whether there are chips, potholes and other damage on its surface.

- It is important to inspect the seats: for the car and for the disk - for their correspondence to each other in terms of size.

- Install diamond disc only when power is off.

- In order not to be injured during the operation, the worker must be at a safe distance, even the slightest contact with the rotating disk and other mechanisms is unacceptable.

- The diamond disc shall be perpendicular to the surface to be treated during the operation. Side pressure should be avoided. The maximum allowable cutting speed (which is usually specified on the disk itself by the manufacturer) cannot be exceeded.

- For some time, the operation should be stopped in order to check the state of the cutting tool and the level of coolant, if the latter is used.

- When the cutting disk is immersed inside the material to be treated, it is forbidden to disconnect the machine.

Foundations made of rubble stone are dismantled after their excavation by excavator and manually on both sides. Simultaneously with earthworks. Key joints are broken with a baffle hammer, released stones are raised by a crane and stored at the storage site, where they are brought into good condition.

Labor Process Map

loading the car with loads from disassembly of the building using the car crane QY25V523 (25t)

Composition of workers Slingshot 4-stage - 1chel.

Sling 3bit - 1chel.

Lifting crane driver - 5bit - 1 person

General Guidelines for the Organization of Vehicle Loading

Loading of materials from disassembly to vehicles - is performed as follows. Vehicles are delivered for loading to the loading and unloading site from the gate of entry to the site. Motor vehicles are supplied by the right or left side to the storage site. Brake the vehicle with a parking brake, put the gearbox lever on the first gear, if necessary, install brake shoes under the wheels. The car must be fed back to the loading site only by the driver at the command of the person responsible for the safe operation of cranes. Workers engaged in loading are forbidden: work in the body of a car with a faulty floor. Loading of the car should be carried out after the driver leaves the dangerous area of ​ ​ the crane. Prior to commencement of work, the person responsible for safe work shall instruct the crane driver and the rafters.

Lifting and movement of small-piece loads and construction debris should be carried out in special containers, while the possibility of falling out of individual elements or products should be excluded.

Special gaskets shall be laid under the sharp faces of the load to protect the slings from damage. Gaskets must be attached to the load or slings to prevent their fall after disassembly of the load.

Requirements for storage of cargo at the storage site:

Loads are placed on leveled platforms, taking measures against spontaneous displacement, subsidence, rolling out of stored materials.

Linings and gaskets in stacks of stored materials should be placed in the same vertical plane. It is not allowed to lean materials and products against fences, and elements of temporary and capital buildings.

There shall be passages not less than 1.0m wide between cargo stacks on site.

Dimensions of storage of main building materials and structures:

Brick in pallet bags - no more than two tiers

Brick in containers - in one tier

Brick without containers - not more than 1,7 m high

Window and door blocks - in cassettes, vertically

Lumber - in a stack, the height of which during ordinary laying is not more than half the width of the stack, and when laid in cages - not more than the width of the stack

Fine-grade metal - in a rack with a height of not more than 1.5 m.

Pipes up to 300 mm in diameter - in a stack up to 3.0m high on liners and gaskets

Rolled ferrous metals - in a stack with a height of not more than 1.5 m with liners and gaskets.

Requirements for removable load-gripping devices and packagings.

Every day prior to commencement of operation, removable load-gripping devices shall be inspected by the slingshot and the person responsible for safe handling of cargo by cranes.

Removable load-gripping devices shall be marked or marked with a metal tag indicating the number, carrying capacity and test date and passport. The load capacity of slings is indicated at an angle between its branches, equal to 90 degrees.

During operation of removable load-gripping devices and packagings shall be inspected periodically within the specified time frame, but not less than :

every 6 months, upon inspection of the traverses

after 1 month, during inspection of ticks, other grips and containers

every 10 days, during the inspection of slings, with the exception of rarely used

rarely used removable load-gripping devices must be inspected before putting into operation.

Instructions for car crane driver

The crane shall be installed for parking in accordance with the work execution project at the direction of the person responsible for safe operation of the cranes. Distance between crane turning part and loads is not less than 1.0m. The driver performs the commands of only the slingshot with a red bandage on the sleeve, except for the "STOP" command, which can be given by anyone who notices the danger.

During operation, the crane driver, after hooking the load and tensioning the ropes, lifts the load and with the load raised above the objects found by 0.5 m, moves the load by turning the boom, on the departure allowing not to take the load beyond the restriction lines marked at the storage site with the signs "cargo carrying is prohibited."

The restriction lines specified in the project of work execution exclude cargo passing beyond the site area fencing with observance of the distance of hazardous areas during loading and unloading operations equal to 4.0m.

After this maneuver, the crane supplies cargo to the place of laying on vehicles, to the prepared place of laying, lowers the load.

At the end of the work, the crane folds the supports and boom into the transport position and leaves the construction site in the garage.

Post-operative actions of rafters.

Check readiness of the site, load grips for work.

Two workers open the sides of the car body, being on the side of the opening side.

In the visibility area of ​ ​ the crane operator, hang a ladder on the body.

Install gaskets on the vehicle platform (floor).

As part of the storage, build up the cargo in accordance with the slinging scheme and strengthen, if necessary, the drawers. To load flexible and soft materials, use special crossarms and towel slings to avoid damage to the load.

Instruct the crane operator to tighten the slings.

Being at the loading site, at a safe distance, issue a command to lift the load by 200300mm.

Check that the sling is correct.

Issue a command to lift the load 1000mm above the floor of the storage site.

Send commands to the crane operator to move the load in the required order.

When moving, accompany the load at a safe distance, keeping it from swinging and rotating with braces.

Move the load to the place of laying on the storage site, issue a command to the crane operator to lower the load by a distance of not more than 1 meter from the site on which the rafter is located. Set up the cargo.

Instruct the crane operator to lower the load to the bottom of the car body.

On the stairs, climb into the car body to check the stability of the load and disassemble it.

Piece loads rising above the side of the car body are tied with ropes or special tarpaulin canopies.

Go down from the body, close the open sides, prepare the car for further follow.

After completion of works, hinged ladders, load-gripping devices and tools shall be removed.

Power supply

Power supply is provided from TP as per temporary diagram.

Portable current collectors operating at a voltage higher than 42v are connected to the network by a wire in rubber insulation. It is allowed to use multi-core copper, flexible wires with insulation for a voltage of at least 500 v, enclosed in a rubber shell.

The power cable, which supplies voltage to the motors of the power tools during their operation, must move freely and be protected from mechanical damage.

Metal enclosures of portable electric receivers (tools) above 42c must be busy with the exception of electric receivers with double insulation.

The driver of the lift must have a qualification group for electronic safety not lower than 2nd.

The building to be disassembled shall be disconnected from all utilities.

Drawings content