• RU
  • icon Waiting For Moderation: 1
Menu

Boiler room - Test work on the basics of foundations

Description

Coursework on the basics of the foundation. St. Petersburg University of Architecture and Civil Engineering. The number of the construction scheme is 4.

The number of the engineering-geological section is 6.

  1. The main parameters of the building

The construction area is the city of St. Petersburg.

The functional purpose of the building is a boiler room.

The level of responsibility of the building is II (normal).

 

 

 

 

 

Project's Content

icon 46itog.dwg
icon 46itog.docx
The material is an archive with files that can be opened in programs:
  • AutoCAD or DWG TrueView
  • Microsoft Word
up Up