ZhBK plant

  • Added: 12.02.2016
  • Size: 298 KB
  • Downloads: 2
Find out how to download this material

Description

Name of the complex and its composition LBC Plant A) main building B) reinforcement workshop C) BSU G) administrative building

Project's Content

icon
icon 2 Завод по произвлдствк ЖБК.dwg
icon 12.docx
icon 2 Завод ЖБК.doc

Additional information

Contents

CONTENTS:

Introduction

Assignment and initial data for course design

Brief description of the general plan and construction conditions of the complex of buildings

Consolidated cost estimate for the construction of the complex

Material and Structural Requirements List for Complex Buildings

Construction Plot Plan

Bill of quantities of construction and installation works and quantity of machine shifts for the main object

Building Complex Construction Schedule

Calculation of Network Parameters and Activity Master Card

Main technical and economic indicators of the design solution

Literature

1. introduction

When organizing the construction of the complex of buildings of the ZhBK plant by an in-line method, the following should be provided: continuous and rhythmic work, systematic commissioning of construction facilities, effective use of material and technical resources, construction machines and equipment.

The in-line execution of various construction and installation works during the construction of a group of objects with homogeneous structures is based on the technological consistency of work according to the time of their execution with the calculation of flow parameters that ensure the continuity and rhythmicity of the production process.

The main advantages of the in-line method, its efficiency are expressed in reducing the total construction time, accelerating the commissioning of facilities and production capacities, the rhythm of construction production, the uniform and most complete use of labor and material and technical resources of production. The result is an increase in labor productivity, a decrease in the cost of construction and installation work and an improvement in their quality.