• RU
  • icon Waiting For Moderation: 0
Menu

Water supply and drainage with hydraulic basics

  • Added: 17.06.2017
  • Size: 6 MB
  • Downloads: 0
Find out how to download this material

Description

Heading robot Water supply and drainage with hydraulic basics of VGASU

Project's Content

icon
icon k_31_07_508885.docx
icon k_31_07_508886.dwg
icon Primer_vypolneniya_raboty__3wycl7za7yo5_509771.docx

Additional information

Contents

Source Data

Description of the building

Accepted water supply system and diagram, material of pipes, methods of their connection

Water supply and water metering unit

Internal water supply network and valves

Hydraulic calculation of internal water supply network

Internal water supply axonometric diagram

Determine estimated costs and probabilities of plumbing fixtures

Hydraulic Mains Calculation Table

Water meter selection. Determination of head losses in the water meter

Determination of required head

Internal sewer design

Hydraulic calculation of internal sewer network

Yard sewage network

Construction of the yard sewer profile

Bibliographic list

1.1. Solution of facility water supply scheme

General Plan. The water supply network, which includes pipelines for entry into the building, must have a minimum length. Pipelines for water supply shall be laid at a distance of at least 3 m from the foundation of the building and other parallel communications. The hatch of the city water supply well (KHV) has a diameter of 700 mm. The elevation of the layout is selected arbitrarily from among the contours on the plot plan of the section, we take 114.5 m.

The plan of the first floor shows projections of water risers with their numbering St B11, St B12, etc. (total 8 risers), access to sanitary devices. The basement plan depicts a water main, access to risers and places of installation of watering cranes (2 cranes (one per section): from the side of the facade and courtyard in the niches of the walls from the outside of the building at a height of 0.35 m of pavement). Water mains material - galvanized steel, diameter is determined by calculation. The diameter of the watering cranes is taken as 20 or 25 mm, I accept 25 mm.

Design of internal house and yard water disposal system

Solution of object drainage scheme

The plot plan of the section shows a gravity drainage network, which includes sewage outlets from the building, a courtyard network of ceramic pipes with a diameter of 150 mm, inspection wells KK11, KK1-2, a rotary well KP, a control tank and a KGK city sewerage well. Yard drainage network with wells installed on it shall be laid at a distance of at least 3 m from the building foundation and other parallel communications. The control well is installed 2 m from the red building line on the side of the courtyard.

The plan of the first floor shows projections of drainage risers with a diameter of 100 mm with their numbering (St K11, St K12,..., St K14) and discharge pipelines (with a diameter of 50 mm).

The basement plan shows projections of drainage risers, exhaust pipelines with brushes near the external walls of the building. The outlet diameter is assumed to be equal to the riser diameter (100 mm) if the outlet serves one riser. With two or more risers, the diameter of the outlet is taken to be 150 mm.

Drawings content

icon k_31_07_508886.dwg

k_31_07_508886.dwg

Free downloading for today

Update after: 4 hours 30 minutes
up Up