• RU
  • icon Waiting For Moderation: 0
Menu

Warm floor cottage

  • Added: 14.08.2014
  • Size: 372 KB
  • Downloads: 0
Find out how to download this material

Description

Warm floor design of a two-story cottage. Heated area 28.9 square meters. m The length of the damper belt is 40 m. The warm floor is becoming more popular, the advantage of it is that a person feels more comfortable, due to the equal temperature throughout the height of the floor.

Project's Content

icon
icon
icon бетон.dwg
icon Ведомость чертежей.xls
icon Коллектор аксонометрия.dwg
icon коллектор.dwg
icon Лист1.doc
icon Лист2.doc
icon настил.dwg
icon Паспорт системы.xls
icon предложение.xls
icon Разрез.dwg
icon Спецификация.xls
icon Тит_лист.doc

Additional information

1 . General instructions.

The design of the heating system was developed on the basis of the Customer's specification, and in accordance with SNiP 2.04.0591 * "Heating, ventilation, air conditioning," SNiP 2.08.0189 * "Residential buildings."

Design temperatures for building ventilation and heating design:

in cold period - (26 ° С),

in warm period - (+ 20 ° С),

indoor - (+ 18 ° С).

The main indicators for the project are presented in the certificate for the heating system.

The heating system is connected to the heat source according to a two-pipe scheme with forced circulation of the coolant.

The heat source is the 6 kW Thermotech Elpana electric boiler.

The temperature of the coolant entering the heating system is controlled by a 3-way control valve with an electric drive.

Coolant circulation in the heating system is carried out by the circulation pump "Grundfoss" UPS 2540, or by a similar pump.

Average coolant speed:

in circuits 0.1 0.3 m/s,

in highways 0.8 - 1.0 m/s.

Filling and makeup of the heating system is carried out from the water supply.

Air is removed from the heating system at the upper points of the headers of the heating system through Mayevsky automatic bleed valves.

Conventionally clean effluents are discharged to the sewage system of the building.

Attach the pipelines taking into account provision of vibration protection and compensation of their thermal elongations and taking into account the requirements of SP 1410298, SP-40-102-2000.

Installation and hydraulic testing of pipelines shall be carried out in accordance with the requirements of SNiP 3.05.0185, "Rules for arrangement and safe operation of steam boilers with steam pressure not more than 0.07 MPa (0.7 kg/cm2), water heating boilers and water heaters with water heating temperature not more than 388 ° K (115 ° С), "" Rules for arrangement and safe operation of steam and hot water pipelines, "SNiP 3.05.0185, SNII480, SNiP III481, SP 4110298, pressure for polyethylene pipelines of heating system is not less than 0.6 MPa.

Drawings content

icon бетон.dwg

бетон.dwg

icon Коллектор аксонометрия.dwg

Коллектор аксонометрия.dwg

icon коллектор.dwg

коллектор.dwg

icon настил.dwg

настил.dwg

icon Разрез.dwg

Разрез.dwg
up Up