• RU
  • icon Waiting For Moderation: 0
Menu

Undercarriage STR diagram

  • Added: 07.12.2021
  • Size: 289 KB
  • Downloads: 0
Find out how to download this material

Description

Workshop Chassis Diagram + Plot Plan and Explanatory Note

Project's Content

icon
icon
icon Генеральный план.bak
icon Генеральный план.cdw
icon Моторный участок.bak
icon Пояснительная записка.doc
icon Ходова часть.bak
icon Ходова часть.cdw

Additional information

Contents

1. Basis of STR power

2. Calculation of the annual scope of work of the STR

2.1.1.Your annual scope of work of repair areas

2.1.2.Year scope of auxiliary works

2.1.3.The total annual scope of work of the STO

2.2. Calculation of the number of production workers

2.2.1.The apparent number of workers

2.2.2.State number of workers

2.3. Calculation of the number of posts and car seats

2.3.1. Work posts

2.3.2. Auxiliary posts

2.4. Calculation of areas of production premises

2.4.1. Calculation of repair areas

2.5. Ventilation calculation

2.6. Heating calculation

2.7.Complication of lighting

2.8. Calculation of water supply

2.9. Compressed Air Unit

3. Selection of process equipment

List of literature

2.9.Installation for compressed air

Installations for the production and distribution of compressed air consist of the following elements :

- compressors with electric drive and automatic start and stop control system;

- air suction filters for cleaning air sucked by the first stage of the compressor from the atmosphere;

- coil coolers with water and oil separators and blowdown valves after each compressor stage;

- air collectors (receivers) - vessels for accumulation of compressed air and reduction valves installed at air outlet from air collectors to distribution network;

- air pipelines, valves, instruments and auxiliary devices required for normal operation of the air distribution network.

On HUNDRED compressors on the nominal pressure of 4.5 MPas (VSh3/40M type) are used. Compressors with nominal pressure of 4.5 MPas are used at the operating pressure of air switches of 2 MPas.

Drawings content

icon Генеральный план.cdw

Генеральный план.cdw

icon Ходова часть.cdw

Ходова часть.cdw

Free downloading for today

Update after: 17 hours 26 minutes
up Up