• RU
  • icon Waiting For Moderation: 8
Menu

TTK Installation of reinforced concrete sub-markets on wooden stepchildren of intermediate AP-shaped supports (length of wooden stepson 9 m) - typical process flow sheet

  • Added: 24.04.2014
  • Size: 51 KB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 597.rtf
up Up