• RU
  • icon Waiting For Moderation: 5
Menu

TTK Installation of reinforced concrete sub-markets on wooden stepchildren of intermediate AP-shaped supports (length of wooden stepson 9 m) - typical process flow sheet

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 597.rtf
The material is an archive with files that can be opened in programs:
  • Microsoft Word
up Up