• RU
  • icon Waiting For Moderation: 20
Menu

TTK Development of pits and installation of reinforced concrete supports of overhead lines 0.4 kV drill-crane - typical process flow sheet

  • Added: 24.04.2014
  • Size: 427 KB
  • Downloads: 0
Find out how to download this material

Description

The archive contains a file with a complete technical map in doc format (Microsoft Word) or in pdf format.

Project's Content

icon
icon 657.rtf
up Up