The technological map was developed for the installation of prefabricated structures of a one-story frame-panel industrial building and the production of stone work when laying walls with a thickness of 0.38 m
- Added: 24.01.2023
- Size: 3 MB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The technological map was developed for the installation of prefabricated structures of a one-story frame-panel industrial building and the production of stone work when laying walls with a thickness of 0.38 m
Project's Content
|
|
кальк+час+календ.xls
|
пояснит.doc
|
графика .dwg
|
Similar materials
- 24.01.2023
- 10.05.2023
- 19.12.2023
- 30.03.2022
- 20.08.2014
- 20.08.2014
Free downloading for today
Update after: 10 hours 2 minutes