Course project "Technology of erection of buildings and structures"
- Added: 18.02.2014
- Size: 1 MB
- Downloads: 0
Description
Process sheet for installation of frame of one-storey industrial building. Job Instruction for Installation of Wall Panels. Plus a note to the exchange rate
Project's Content
|
5303544ba620a-________________________53_1.frw
|
53035442aadfe-________________________53_1.docx
|
53035452d8325-________________________53_1.docx
|
Additional information
Contents
Introduction
1. Source Data
2. Calculation of precast reinforced concrete elements
3. List of load-gripping devices for installation and temporary attachment of structures
4. Calculation of requirements for fixtures for temporary fixation of columns
5. Selection, by technical parameters, of cranes for installation
6. Generation of alternative installation options
7. Calculation of calculation of labor costs and wages of assembly works
8. Generation and calculation of the installation schedule
9. Comparison of efficiency of installation complexes by technical and economic indicators
10. Comparison of efficiency of installation complexes by technical and economic indicators
11. Generation and calculation of hourly schedule of installation from wheels of building structures
12. Material and Product Requirements Calculation
13. Requirements to quality of works during installation of one-storey industrial building
14. Occupational safety measures during installation
List of used literature
Introduction
Industrial civil engineering includes the construction of a large number of various facilities, permanent devices not only residential buildings, culverts, bridges, but also industrial buildings.
The process of assembling such objects from parts of high production availability, or installation, is the most preferred and advanced mass construction technology.
The purpose of the course project is to master the basis of the integrated mechanization design and the installation technology of building structures of full-assembly buildings. In addition, it is required to master the procedure for developing the main documents of the installation project: process diagrams for installation of prefabricated elements, task lists for installation processes, work schedules, scope lists, labor and material resources
Similar materials
- 28.01.2019
- 04.06.2015
- 24.01.2023
- 29.05.2015