Technological map for the installation of a wall in the ground
- Added: 30.10.2023
- Size: 466 KB
- Downloads: 0
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The works considered by the map include:
- excavation of the trench with an excavator equipped with a flat grab;
- installation of grip stoppers and reinforcement frames in the trench;
- Laying concrete in the trench using the method of vertically moving pipe.
Project's Content
ЛИСТ 7.dwg
|
Similar materials
- 22.10.2023
- 24.01.2023
- 04.11.2022
- 13.05.2023
- 04.11.2022
Free downloading for today
Update after: 19 hours 45 minutes