Description

Technological map for the construction of reinforced concrete strip foundations under the walls of a brick building

Project's Content

icon kursach_tekhnolog_karta_1.docx
icon tekhnologicheskaya_karta.dwg
icon obyomy_rabot_sandra.xls
icon 00_vedomost_prisposobleniy_i_sredstv_maloy_mekhanizatsii_sandra (1).xls
icon 03_raschyot_sostava_komplexnoy_brigady_sandra.xls
icon 00_vedomost_prisposobleniy_i_sredstv_maloy_mekhanizatsii_sandra.xls
icon 02_kalkulyatsia_sandra.xls

Additional information

Contents

Introduction

1. Scope of Application

2. Organization and procedure of works execution

3. Work Quality Requirements

4. Requirements for logistical resources

5. Safety and Health

6. Technical and economic indicators

7. Applications:

List of used literature

Introduction

The Process Plan (PP) is developed to describe the composition of the process at the construction site, the labour intensity of the activities performed, quality requirements, resources and mechanization tools, as well as safety measures and other aspects related to the construction. Each task has its own routing.

The process sheet is an integral part of the organizational and technological documentation, which regulates the performance of specific construction works, the use of mechanization tools (special equipment, construction machines), establishes requirements for quality control and the procedure for acceptance of works. The map also describes the measures necessary to ensure the safety of workers, TB rules, fire safety and environmental protection standards.

In addition, the DTD includes the PDP (Work Execution Project) and other documents describing the decisions regarding the organization of all construction and installation processes.

To start work at any site, it is necessary that the documentation is correctly drawn up, agreed and registered in the appropriate instances. A well-designed TC will not only help organize the entire technological process, but will also streamline costs and reduce the cost of construction work without compromising the final quality and safety of employees at the site.