Sports and recreation complex with swimming pool
- Added: 06.04.2022
- Size: 10 MB
- Downloads: 7
Description
Water supply and sewerage system
Project's Content
+1 Обложка и титульный лист_вода.docx
|
+8 Приложение №2. Гидравлический расчет.pdf
|
+4 Клятва ГИПа.docx
|
+6 Графическая часть ВК1_.dwg
|
+3 СПД Фряново с изм..doc
|
+10 СРО ПИ1.pdf
|
+7 Приложение 1. Балансовая таблица (ИОС2.1).docx
|
+5 ПЗ.doc
|
+2 Состав тома.doc
|
+9 Водомерный узел.pdf
|
Additional information
Contents
1. GENERAL GUIDELINES
2. WATER SUPPLY
a) Information on existing and projected sources of water supply
b) Information on existing and projected protection zones of drinking water sources, water protection zones
c) Description and characteristics of the water supply system and its parameters
d) Information on the estimated (design) water consumption for household and drinking needs, including automatic fire extinguishing and technical water supply, including circulating
e) Information on design (design) water consumption for production needs - for production facilities
f) Information on actual and required head in the water supply network, design solutions and engineering equipment ensuring the creation of the required head of water
g) Information on pipe materials of water supply systems and measures for their protection against aggressive impact of soils and groundwater
h) Information on water quality
and) List of measures to ensure established water quality indicators for various consumers
k) List of water redundancy measures
l) List of measures for water consumption accounting
m) Description of the water supply automation system
n) List of measures for rational use of water, its saving
a) Description of hot water supply system
p) Description of cooling water supply system and measures ensuring reuse of heated water heat
c) Balance of water consumption and water disposal for the capital construction facility as a whole and for the main production processes - for production facilities
t) Balance of water consumption and water disposal by capital construction facility - for non-production facilities
1. General Indications
Solutions for internal water supply networks are developed in this section of the project. The designed facility is a fitness center with a swimming pool located at: Moscow region, r.p. Fryanovo.
During the development of the section "Water supply" the following initial data and regulatory documents were used:
Architectural and planning solution;
SP 30.13330.2012 "Internal water supply and sewerage of buildings." Updated revision of SNiP 2.04.0185 *;
SP 118.13330.2012 "Public Buildings and Structures." Updated revision of SNiP 31062009;
SP 311132004 "Swimming pools";
SP 73.13330.2012 "Internal Sanitary and Technical Systems";
SP 10.13130.2009 "Internal Fire Water Supply";
The design documentation corresponds to the design assignment, the issued specifications, the requirements of the current technical regulations, standards, codes of rules and other documents containing the established requirements.
Similar materials
- 03.08.2022
- 08.03.2024