• RU
  • icon Waiting For Moderation: 0
Menu

Sibur-Neftekhim Petrochemical Plant Shop No. 62. Fire retardant valve control automation - electrical diagrams

  • Added: 09.07.2014
  • Size: 674 KB
  • Downloads: 0
Find out how to download this material

Description

Course design of a 3-storey office building for 150 employees with an attached conference hall. Structural diagram with full frame. Curtain walls made of three-layer reinforced concrete panels with effective insulation. In the project there are drawings of the ERP - plans of the foundation, flooring and covering, roofing - structural sections and sections - master plan of the planned building placement within the existing development. There is no explanatory note

Project's Content

icon
icon 11.dwg
icon 1.dwg

Additional information

Drawings content

icon 11.dwg

11.dwg

icon 1.dwg

1.dwg

Free downloading for today

Update after: 8 hours 43 minutes
up Up