School for 100 students - Power equipment project
- Added: 01.07.2014
- Size: 2 MB
- Downloads: 2
Find out how to download this material
Subscribe to receive an information about new materials:
Description
The electric power equipment design was implemented on the basis of architectural, construction, sanitary, technological parts of the project, the requirements of PUE-2003, SP 31-110-2003, SO153-34.21.122-2003. The school's eluting system belongs to category III of reliability of power supply, with the exception of electric receivers of fire protection devices and security alarms, which belong to category I. In operating mode, electric receivers of category III are provided with electricity from KTP-250/6.0/0.4kV. For electric receivers of category I, the installation of the EDL 2600TE diesel power plant of YMAHA company with a nominal output capacity of 21 kV is provided. The diesel power plant is started manually by maintenance personnel. Switching from working input to reserve is made avtrmatichesk through t AVR. ShchAP-33 with In = 40A, established in switchboard school
Project's Content
|
Школа на 100 мест ЭМ .dwg
|
Similar materials
- 24.01.2023
- 04.11.2022
Free downloading for today
Update after: 6 hours 17 minutes