• RU
  • icon Waiting For Moderation: 0
Menu

Scheme of reconstruction of a commercial VOG

Description

The working project envisages the reconstruction of the existing gas metering unit, namely:

 

- dismantling of the existing VOG with the operating gas meter Kurs-01 G16;

 

- installation of a measuring complex with a rotary gas meter KVR-1.02-G40-40-0.40-V2-VN with a built-in volume conversion device with a communication module MS-IMoD-Vega-1 for communication with the dispatcher at the initiative of the UUG.

Project's Content

icon ВОГ Замена Курс на КВР НД Ду40 Образец.dwg
The material is a file that can be opened in program:
  • AutoCAD or DWG TrueView

Free downloading for today

Update after: 16 hours 7 minutes
up Up