Reconstruction of TP No. 106 Design documentation for technical re-equipment and reconstruction of electrical networks of OJSC

  • Added: 08.02.2015
  • Size: 9 MB
  • Downloads: 2
Find out how to download this material

Description

Reconstruction of electric power facilities of IDGC Center OJSC (a branch of Kostromaenergo). Reconstruction of TP No. 106. New installation of a complete transformer substation manufactured by ZAO Electric Shield Samara. Electrical equipment of a typical substation has been modified in agreement with the manufacturer. The questionnaire in the project.

Project's Content

icon
icon
icon 176 КТП-СЭЩ-К-400-тп400_BK Model (1).jpg
icon 176 КТП-СЭЩ-К-400-тп400_BK.dwg
icon 176_Титул.docx
icon План сетей.jpg
icon Расчёт искусственного заземлителя КТП-СЭЩ-К (ВК).docx
icon ТЗ ст1.jpg
icon ТЗ ст5.jpg
icon ЭС.СО Спецификация.docx

Additional information

Drawings content

icon 176 КТП-СЭЩ-К-400-тп400_BK.dwg

176 КТП-СЭЩ-К-400-тп400_BK.dwg