• RU
  • icon Waiting For Moderation: 12
Menu

Reconstruction of the store Detsky Mir and its extension. Smoke removal

  • Added: 14.08.2014
  • Size: 331 KB
  • Downloads: 4
Find out how to download this material

Description

Smoke ventilation of the store. calculation of smoke ventilation. Calculation of the amount of smoke to be removed. Aerodynamic calculation of air pressure. aerodynamic

Project's Content

icon
icon
icon
icon Dym-15.dwg
icon specif.dwg
icon Аэродин_расчет_дымоуд_(посл).xls
icon Аэродин_расчет_подпора.xls
icon Расчет дымоудаления.doc
icon Расчет количества удаляемого дыма_2.doc
icon Расчет подпора.doc

Additional information

Contents

Contents:

1. Calculation of the amount of smoke to be removed

2. Calculation of plenum smoke ventilation of elevator unit

2.1 Calculation of locks vestibules in axes 5-7, E-G and 5-8, K-L

2.2. Calculation of locks vestibules in axes 9-11, K-L

2.3. Calculation of outdoor air supply to elevator shafts in axes 5-7, E-G and 5-8, K-L

3. List of used literature

Drawings content

icon Dym-15.dwg

Dym-15.dwg

icon specif.dwg

specif.dwg
up Up