• RU
  • icon Waiting For Moderation: 5
Menu

RECONSTRUCTION OF THE ELECTRICAL SUPPLY SYSTEM OF THE CALENDER SHOP OF VOLTYRE-PROM JSC

  • Added: 11.03.2023
  • Size: 904 KB
  • Downloads: 3
Find out how to download this material

Description

Theme of the final qualification work: "Reconstruction of the power supply system of the calender shop of JSC "Voltyre-Prom".

The objectives of the final qualification work: development of solutions for the power supply of the calender shop of JSC "Voltyre-Prom".

Tasks of the final qualifying work: to analyze and determine the electrical load of the shop; select motors; select and determine the routing of power lines, lighting systems, high-voltage equipment, develop solutions for labor protection and safety.

 

Project's Content

icon №2.cdw
icon №1.cdw
icon №3.cdw
icon №6.cdw
icon №4.cdw
icon ПЗ.docx
icon №5.cdw

Additional information

Drawings content

icon №2.cdw

№2.cdw

icon №1.cdw

№1.cdw

icon №3.cdw

№3.cdw

icon №6.cdw

№6.cdw

icon №4.cdw

№4.cdw

icon №5.cdw

№5.cdw
up Up