RECONSTRUCTION OF THE ELECTRICAL SUPPLY SYSTEM OF THE CALENDER SHOP OF VOLTYRE-PROM JSC
- Added: 11.03.2023
- Size: 904 KB
- Downloads: 3
Description
Theme of the final qualification work: "Reconstruction of the power supply system of the calender shop of JSC "Voltyre-Prom".
The objectives of the final qualification work: development of solutions for the power supply of the calender shop of JSC "Voltyre-Prom".
Tasks of the final qualifying work: to analyze and determine the electrical load of the shop; select motors; select and determine the routing of power lines, lighting systems, high-voltage equipment, develop solutions for labor protection and safety.
Project's Content
|
|
|
|
|
|
|
|
|
|
|
|
|
|
- Kompas or KOMPAS-3D Viewer
- Microsoft Word
Additional information
№2.cdw
№1.cdw
№3.cdw
№6.cdw
№4.cdw
№5.cdw
Similar materials
- 16.05.2022
- 25.01.2023