Reconstruction of the brick factory with the transfer of the ring furnace to tunnel furnaces with an increase in production capacity from 10...12 to 20 million tons. pieces per year
- Added: 24.01.2023
- Size: 377 KB
- Downloads: 0
Subscribe to receive an information about new materials:
Description
Reconstruction of the brick factory with the transfer of the ring furnace to tunnel furnaces with an increase in production capacity from 10...12 to 20 million tons. pieces per year
Project's Content
|
|
|
|
|
|
The material is an archive with files that can be opened in programs:
- AutoCAD or DWG TrueView
- Microsoft Word
Additional information
Drawings content
kursova-stinovi.dwg
Similar materials
- 24.01.2023
- 22.02.2025
- 20.02.2018
- 26.01.2018
Free downloading for today
Update after: 13 hours 20 minutes