• RU
  • icon Waiting For Moderation: 0
Menu

Reconstruction of the brick factory with the transfer of the ring furnace to tunnel furnaces with an increase in production capacity from 10...12 to 20 million tons. pieces per year

  • Added: 24.01.2023
  • Size: 377 KB
  • Downloads: 0
Find out how to download this material

Description

Reconstruction of the brick factory with the transfer of the ring furnace to tunnel furnaces with an increase in production capacity from 10...12 to 20 million tons. pieces per year

Project's Content

icon
icon kursova-stinovi.dwg
icon kursova-stinovi.doc

Additional information

Drawings content

icon kursova-stinovi.dwg

kursova-stinovi.dwg

Free downloading for today

Update after: 7 hours 4 minutes
up Up