I. ARCHITECTURAL AND CONSTRUCTION PART
INTRODUCTION
I.1. INPUT DATA:
I.2. TECHNOLOGICAL PROCESS OF PRODUCTION
I.3. DECISION OF THE MASTER PLAN
I.4. TECHNICAL AND ECONOMIC INDICATORS OF INDUSTRIAL AREA PLANNING
I.5. SPACE-PLANNING SOLUTION
I.5.1. Production building
I.5.2. Administrative and amenity building
I.6. DESIGN SOLUTION
I.6.1. Production building
I.6.2. Administrative and amenity building
I.7. FINISHING WORKS
I.7.1. Outdoor
I.7.2. Internal
I.8. THERMAL DESIGN OF THE EXTERIOR WALL
I.8.1. Determination of wall panel thickness
I.9. THERMAL ENGINEERING CALCULATION OF THE ROOF
I.9.1. Determination of roof insulation thickness
I.10. ENGINEERING EQUIPMENT
II. STRUCTURAL AND DESIGN PART
II.1. FEASIBILITY STUDY OF THE CHOICE OF DESIGN SOLUTIONS
II.2. DETERMINATION OF THE DURATION OF THE FRAME INSTALLATION
II.3. CALCULATION OF REINFORCED CONCRETE STRUCTURES OF A ONE-STOREY FRAME BUILDING
II.13.1. Design of the Pavement Slab
II.13.2. Design of a reinforced concrete two-branch column.
III. TECHNOLOGY, ORGANIZATION AND ECONOMICS OF CONSTRUCTION
III.1 QUANTITY SCORECARD
III.2 SPECIFICATION OF MOUNTING BLADES
III.3. TECHNOLOGICAL MAP FOR THE INSTALLATION OF BUILDING STRUCTURES COVERING THE BUILDING
III.4. SELECTION OF WORK METHODS
III.4.1. Selection of an erection crane according to technical parameters
III.4.2. Required mounting devices and lifting devices
III.4.3. Statement of Labor Inputs, Machine Operating Time and Labor Costs 51
III.5. SCHEDULING
III.5.1. List of labor intensity of work and need for machine shifts
III.5.2. Schedule Guide Card
III.5.3 Dividing the construction process into its component parts
III.5.4. Operational quality control
III.6. DESIGN OF THE CONSTRUCTION PLAN
III.6.1. Layout of the construction plan
III.6.2. Determination of the need for basic building materials, structures, parts and semi-finished products
III.6.3 . Summary List of Materials, Semi-Finished Products and Items
III.7.. CALCULATION OF REQUIREMENTS FOR TEMPORARY BUILDINGS AND WAREHOUSES
III7.1. Organization of on-site warehouses
III.7.2. Warehouse Area Calculation Sheet
III.7.3 Area Calculation Sheet and Selection of Types of Temporary Inventory
Buildings
III.8. CALCULATION OF TEMPORARY POWER SUPPLY TO THE CONSTRUCTION SITE
III.9. CALCULATION OF TEMPORARY WATER SUPPLY OF THE CONSTRUCTION SITE
III.10. ESTIMATE DOCUMENTATION
III.10.1 Cost estimates
III.10.2 . Local Estimate
III11. CALCULATION OF TECHNICAL AND ECONOMIC INDICATORS
IV. OCCUPATIONAL HEALTH AND SAFETY
IV.1. ASSESSMENT OF INDUSTRIAL HAZARDS AND HAZARDS DURING THE CONSTRUCTION OF THE MASS MEDIA PLANT
IV.2. SAFETY REQUIREMENTS FOR THE ARRANGEMENT AND MAINTENANCE OF WORK SITES AND WORKPLACES
IV.3. SAFETY TECHNIQUE OF INSTALLATION AND ROOFING WORKS
IV.3.1. Safety of installation works
IV.3.2. Safety of roofing works
IV.4. ENGINEERING MEASURES FOR SAFE PERFORMANCE OF CONSTRUCTION, INSTALLATION AND EARTHWORKS
IV.5. FENCING OF THE CONSTRUCTION AREA
IV.6 ENSURING FIRE SAFETY AT THE CONSTRUCTION SITE
IV.7. FIRE PREVENTION
REFERENCES
Project's Content
|
|
Записка.doc
|
Класс арматурной стали.doc
|
Класс бетона.doc
|
ПРИЛОЖЕНИЕ ДЛЯ ДИПЛОМА.doc
|
Сводный сметный расчет семенов.xls
|
Лист номер 1.dwg
|
|
Лист номер 10.dwg
|
Лист номер 11.dwg
|
Лист номер 12.dwg
|
Лист номер 2.dwg
|
Лист номер 3.dwg
|
Лист номер 4.dwg
|
Лист номер 5.dwg
|
Лист номер 6.dwg
|
Лист номер 7.dwg
|
Лист номер 8.dwg
|
Лист номер 9.dwg
|
Similar materials
- 09.07.2014
- 29.07.2014
- 25.03.2022
- 04.11.2022
- 24.01.2023
- 04.11.2022