• RU
  • icon Waiting For Moderation: 0
Menu

Production building of the enterprise in Moscow - Diploma

  • Added: 20.10.2023
  • Size: 1 MB
  • Downloads: 2
Find out how to download this material

Description

 

I.      ARCHITECTURAL AND CONSTRUCTION PART

 

INTRODUCTION

 

I.1. INPUT DATA:

I.2. TECHNOLOGICAL PROCESS OF PRODUCTION

I.3. DECISION OF THE MASTER PLAN

I.4. TECHNICAL AND ECONOMIC INDICATORS OF INDUSTRIAL AREA PLANNING

I.5. SPACE-PLANNING SOLUTION

I.5.1. Production building

I.5.2. Administrative and amenity building

I.6.  DESIGN SOLUTION

I.6.1. Production building

I.6.2. Administrative and amenity building

I.7. FINISHING WORKS

I.7.1. Outdoor

I.7.2. Internal

I.8. THERMAL DESIGN OF THE EXTERIOR WALL

I.8.1. Determination of wall panel thickness

I.9. THERMAL ENGINEERING CALCULATION OF THE ROOF

I.9.1. Determination of roof insulation thickness

I.10. ENGINEERING EQUIPMENT

II. STRUCTURAL AND DESIGN PART

II.1. FEASIBILITY STUDY OF THE CHOICE OF DESIGN SOLUTIONS

II.2. DETERMINATION OF THE DURATION OF THE FRAME INSTALLATION

II.3. CALCULATION OF REINFORCED CONCRETE STRUCTURES OF A ONE-STOREY FRAME BUILDING

II.13.1. Design of the Pavement Slab

II.13.2. Design of a reinforced concrete two-branch column.

III.    TECHNOLOGY, ORGANIZATION AND  ECONOMICS OF CONSTRUCTION

    III.1   QUANTITY SCORECARD

     III.2    SPECIFICATION OF MOUNTING BLADES

III.3. TECHNOLOGICAL MAP FOR THE INSTALLATION OF BUILDING STRUCTURES COVERING THE BUILDING

III.4. SELECTION OF WORK METHODS

III.4.1. Selection of an erection crane according to technical parameters

III.4.2. Required mounting devices and lifting devices

III.4.3. Statement of Labor Inputs, Machine Operating Time and Labor Costs                     51

III.5.        SCHEDULING      

     III.5.1. List of labor intensity of work and need for machine shifts

     III.5.2.  Schedule Guide Card

III.5.3  Dividing the construction process into its component parts

III.5.4.  Operational quality control

III.6.        DESIGN OF THE CONSTRUCTION PLAN

       III.6.1.  Layout of the construction plan

III.6.2.   Determination of the need for basic building materials, structures, parts and semi-finished products

III.6.3  . Summary List of Materials, Semi-Finished Products and Items

III.7..        CALCULATION OF REQUIREMENTS FOR TEMPORARY BUILDINGS AND WAREHOUSES

   III7.1.   Organization of on-site warehouses

III.7.2.  Warehouse Area Calculation Sheet

III.7.3   Area Calculation Sheet and Selection of Types of Temporary Inventory

Buildings 

III.8.        CALCULATION OF TEMPORARY POWER SUPPLY TO THE CONSTRUCTION SITE

III.9.        CALCULATION OF TEMPORARY WATER SUPPLY OF THE CONSTRUCTION SITE

III.10.      ESTIMATE DOCUMENTATION

III.10.1    Cost estimates

III.10.2  . Local Estimate

III11.       CALCULATION OF TECHNICAL AND ECONOMIC INDICATORS

IV.   OCCUPATIONAL HEALTH AND SAFETY

IV.1.        ASSESSMENT OF INDUSTRIAL HAZARDS AND HAZARDS DURING THE CONSTRUCTION OF THE MASS MEDIA PLANT

     IV.2.  SAFETY REQUIREMENTS FOR THE ARRANGEMENT AND MAINTENANCE    OF WORK SITES AND WORKPLACES

     IV.3.   SAFETY TECHNIQUE OF INSTALLATION AND ROOFING WORKS

                 IV.3.1.  Safety of installation works

                IV.3.2.   Safety of roofing works

IV.4.        ENGINEERING MEASURES FOR SAFE PERFORMANCE OF CONSTRUCTION, INSTALLATION AND EARTHWORKS

    IV.5.  FENCING OF THE CONSTRUCTION AREA

     IV.6  ENSURING FIRE SAFETY AT THE CONSTRUCTION SITE

 IV.7.       FIRE PREVENTION

REFERENCES               

Project's Content

icon
icon
icon Записка.doc
icon Класс арматурной стали.doc
icon Класс бетона.doc
icon ПРИЛОЖЕНИЕ ДЛЯ ДИПЛОМА.doc
icon Сводный сметный расчет семенов.xls
icon Лист номер 1.dwg
icon
icon Лист номер 10.dwg
icon Лист номер 11.dwg
icon Лист номер 12.dwg
icon Лист номер 2.dwg
icon Лист номер 3.dwg
icon Лист номер 4.dwg
icon Лист номер 5.dwg
icon Лист номер 6.dwg
icon Лист номер 7.dwg
icon Лист номер 8.dwg
icon Лист номер 9.dwg

Free downloading for today

Update after: 7 hours
up Up